121 BP Phase 1-LR 990809 GEOTECHNICAL AND J~i J=~J r-1 I I F:=
ENVIRONHENTAL CONSULTANTS I
REPORT OF PIER OBSERVATION
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 25
P.O. Box 802047 REPORT DATE: 08-09-99
DalLas, Texas 75380-2047 REG PROJECT NO. 5607
ATTN: Mr. John Walsh TECHNICIAN: B. Ray
PAGE: 1 of 1
CONTRACTOR: Westcliffe, Inc.
Building 2 (751 Canyon Drive)
Required. Depth to Total Depth Actual.
Shaft Size PenetratiOn Bearing : of Pier PenetratiOn
Date Pier No. (inches) (feet) (feet) .... "' (~eet) (feet)
08-03-99 B.2-1 24 2.0 7.0 9.6 2.6
B-3.5' 24 2.0 9.0 11.0 2.0
* Pier required use of temporary casing.
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure James F. Phipps, P.E.
(1) Campbell Associates/ KA/je
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
24.24 STL;TZ DR. · SUITE 4C0 · DALLAS. TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019