Loading...
121 BP Phase 1-LR 990809 GEOTECHNICAL AND J~i J=~J r-1 I I F:= ENVIRONHENTAL CONSULTANTS I REPORT OF PIER OBSERVATION 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 25 P.O. Box 802047 REPORT DATE: 08-09-99 DalLas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh TECHNICIAN: B. Ray PAGE: 1 of 1 CONTRACTOR: Westcliffe, Inc. Building 2 (751 Canyon Drive) Required. Depth to Total Depth Actual. Shaft Size PenetratiOn Bearing : of Pier PenetratiOn Date Pier No. (inches) (feet) (feet) .... "' (~eet) (feet) 08-03-99 B.2-1 24 2.0 7.0 9.6 2.6 B-3.5' 24 2.0 9.0 11.0 2.0 * Pier required use of temporary casing. Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure James F. Phipps, P.E. (1) Campbell Associates/ KA/je Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate 24.24 STL;TZ DR. · SUITE 4C0 · DALLAS. TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019