Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Northlake 635(5)-LR000221
REPORT OF DRILLED BELLED PIERS 89Ol Capeter Fn,0,., Suito #100 Dall,~, Texas 75247 Project: ProJoct No.: Coppell Commerce Center 1234 Lakeshore (Bldg. B), Coppell, Texas 94991457 Report No.: 0004907 Date of Service: 02/21/00 Technician: R. Montgomery Paae: lof2 Pier Identification HI3 L/5 K/5 JI5 HI4 Gl4 Gl3 G/2 Fl4 E/4 DI4 Pier Diameter (in.) 24 24 24 24 24 24 24 24 24 24 24 Bell Diameter (in.) 54 54 54 54 54 54 54 54 54 54 54 Top of Pier Elevation (ft) 99.0 98.5 98.5 98.5 99.0 98.5 98.5 98.5 99.0 99.0 99.0 Req. Depth ;~o~ Exist. Grade (ft) 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 Initial Depth of Pier from Existing Grade (It) 18.16 19.50 18.50 18.00 18.83 18.0 18.16 18.42 18.16 18.33 18.92 Final Depth of Pier from Existing Grade Irt) 18.50 19.92 19.16 18.42 18.92 18.25 18.58 18.42 18.50 18.58 19.08 Depth.from Top of Concrete (It) 18.0 19.00 18.0 17.75 18.16 t7.16 17.16 17.33 18.16 18.00 18.67 Condition of Bottom (-'~.., or d~j) Dqf Dry D~y, Dry Dry D;y Dnj Dry Dry D~y D~y Plumb Within Tolerance ~-~,~. or no) Yes Yes Yes Yes Yes Yes Yes ,, Yes Y,es Yes Yes ( C-__-."ng ~,,ame--~r. (in) N/A N/A N/A NIA NIA N/A N/A N/A N/A N/A N/A r.---~. Depth (ft) N/A N/A N/A N/A N/A N/A N/A NIA N/A N/A N/A Number of Ve~_~_~! _Rf~__nS (ea.) 6 6 6 6 6 6 6 6 6 6 6 tut t Reinforcing Bar S_be (it) ,, 6 ,6 6 6 6 6 6 6 6 6 6 Length of Verfic~_! _Re_.,~ (ft.). 17.50 18.50 17.50 17.25 17.67 16.67 16.67 16.83 17.67 17.50 18.16 Time Drilling ..--a_- Comp!_-,ted 1:18p.m. 11:10a.m. 11:30a.m. 11:42a.m. 11:58a.m. 1:04p.m. 1:30p.m. 1:58p.m. 2:22p.m. 2:36p.m. 2:50p.m. Time Concrete was Maced 3:00 p.m. 2:21 p.m. 2:30 p.m. 2:35 p.m. 2:58 p.m. 3:05 p.m. 3:25 p.m. 3:30 p.m. 3:35 p.m. 3:40 p.m. 5:05 p.m. ;' ' ' II I 111' III II I REPORT OF DRILLED BELLED PIERS Project: Project No.: Coppell Commerce Center 1234 Lakcshore (Bldg. B), Coppell, Texas 94991457 8901 Carpeater Fnvy., Suite #10o Report No.: 0004907 Date of Service: 02/21/00 Technician: R. Montgomery Page: 2of2 d Pier Idenflflcetion D/6 D/7 DI8 D/9 D/10 D/11 C/11 C/10 C/9 C/8 /J~ Pier Diameter (in.) 24 24 24 24 24 24 24 24 24 24 Bell Diameter (in.) 54 54 54 54 54 54 54 54 54 54 Top of Pier Elevation (ft) 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 99.0 RecI. Depth from Exist. Grade (ft) 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 18.0 Initial Depth of Pier from Exleflng Grade {it) 18.08 18.50 18.50 18.50 18.42 18,67 18.50 18.83 18.00 18.33 Final Depth of Pier from Existing G.mde {It) 18.16 18.67 18.50 18.58 18.75 19.33 18.50 19.00 18.00 18.33 Depth from TOp of concrete (It) 17.83 17.92 17.83 17.75 17.83 18.75 17.83 18.25 17.67 17.67 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry .......... p,!u,mb Within Tolerance (ye~ or no) Yes Yes ,Yes Yes Yes Yes Yes Yes Yes Yes ( ~ Cealng Diameter (in) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A ca~ed Depth (It) , ,, NIA NIA NIA NIA N/A NIA NIA N/A N/A N/A ,,, Number of Verti~al. Barn (ea.) 6 6 6 6 6 6 6 6 6 6 nalnfor~!ng B~r Size (t) , . 6 6 6 6 6 , 6 6 6 6 6 Length of Vertical Barn (ft.)' 17.33 17.42 17.33 17.25 17.33 18.25 17.33 17,75 17.16 17.16 Time Drilling w~s COmldeted 3:02 p.m. 3:18 p.m. 3:27 p.m. 3:40 p.m. 3:50 p.m. 4:10 p.m. 4:15 p.m. 3:48 p.m. 3:38 p.m. 3'26 p.m. Time Concrete was Placed 5:08 p.m. 5:12 p.m. 5:17 p.m. 5:21 p.m. 5:25 p.m. 5:30 p.m. 5:28 p.m. 5:31 p.m. 5:35 p.m. 5:4.5.p:m: . I ' II I I I I