121 BP Phase 1-LR 990804 GEOTECHN:CAL .-' ND ~ ~ I--1 U ~
E'xlV RONM~:NTAL CCNSULTANTS
CONCRETE CYLINDER TEST REPORT
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 35
P.O. Box 802047 REG PROJECT NO. 5607
Dallas~ Texas 75380-2047 SAMPLE DATE: 08-04-99
ATTN: Mr. John Walsh TECHNICIAN: F. Steadman
CONTRACTOR: WestciJffe. inc.
Location of Sample
Set Number I Location ! Quantity Represented
1 Slab: 35'N. 50'W of SE Corner of Bldg 2 70/430
2 Slab: 80'N, 25'W of SE Corner of Bldg 2 170/430
3 Slab: 120'S, 35'E of NW Corner of Bldg 2 280/430
4 Slab: 55'S. 25'W of NE Corner of Bldg 2 370/430
Design Information
I Source of Concrete I Mix Identification Specified Strength p.s.i.
I Lattimore 18 4000
Test Results
No. ID Date Tested Test lbs. Strength p.s.i, p.s.i.
1 6378 08-11-99 7 101870 3600
6378 09-01-99 28
6378 09-01-99 28
6378 Hold
2 6379 08-11-99 7 115380 4080
6379 09-01-99 28
6379 09-01-99 28
6379 Hold
3 6380 08-11-99 7 109680 3880
6380 09-01-99 28
6380 09-01-99 28
6380 Hold
4 6381 08-11-99 7 105310 3730
6381 09-01-99 28
6381 09-01-99 28
6381 Hold
2424 STUTZ DR S~ITE zZ.~ · D.:,--.'~S TX 75,23=, · -E- [Z'4] 353 ?-~'' · =AX ~ZIZ] .~f::;, 2T.'.-':
Cylinder Data
Set~i-I CYlinder ] '' Timeof . .. ........Concrete "-'Air' i Ticket
No.', .i:. ID" t 'i:'Siump Sample Air:TemP~i: -':.iYeh~P, . Entrainment i!.. Number
: 1 6378 5.25 4:45 AM 75 91 N/A 7075044
! 2 6379 4.75 5:50 AM 78 89 N/A 7075054
3 6380 5,00 7:00 AM 78 91 N/A 70?5065
4 6381 5,25 8:10 AM 78 89 N/A 7075074
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(!) The Industrial Group/
Mr. Mac McClure Keith E. Atkins
(1) Campbell Associates/ KEA/sa
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
GEOTECHNICAL AN~ r~ F=J i--1 I I F:~
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
121 Business Park- Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 35
P.O. Box 802047 REG PROJECT NO. 5607
Dallas, Texas 75380-2047 SAMPLE DATE: 08-04-99
ATTN: Mr. John Walsh TECHNICIAN: F. Steadman
CONTRACTOR: Westcliffe, Inc.
Location of Sample
Set Number I Location I Quantity Represented
1 Slab: 35'N, 50'W SE corner Bldg. 2 70/430
2 Slab: 80'N, 25'W SE corner Bldg. 2 170/430
3 Slab: 35'E,120'S NW corner Bldg. 2 280/430
4 Slab: 55'S, 25'W SE corner Bldg. 2 370/430
Design Information
Source of Concrete J Mix Identification J Specified Strength p.s.i.
, Lattimore 18 4000
Test Results
SetI Cy'inderI Age@ I Tota, Lo.dI StrengthC°mpressiVep.s.i. Average Strength Ip.s.i.
No. ID Date Tested Test lbs.
I 6378 08-11-99 7 101870 3600
6378 09-01-99 28 127370 4510
6378 09-01-99 28 128220 4540 4530
6378 Hold H
2 6379 08-11-99 7 115380 4080
6379 09-01-99 28 149010 5270
6379 09-01-99 28 143900 5090 5 !80
6379 Hold H
3 6380 08-11-99 7 109680 3880
6380 09-01-99 28 151160 5350
6380 09-01-99 28 145940 5160 5260
6380 Hold H
4 6381 08-11-99 7 105310 3730
6381 09-01-99 28 130320 4610
6381 09-01-99 28 132200 4680 4650
6381 Hold FI
2424 STJTZ DR SUITE 4....Z · ZALLAS TX -£22E * TEL ~2'4~ 3f.Z 05-'--'-'---' · :--'~. ~2'-'-[ 3EC f'...:l~-
Cylinder Data
Set ::I Cytinder I':"i:" 1TM ..--:.:.-:t!C0ncrete '.Air I Ticket
No. :.i -:~ID'.'. si~P::. ..!Sampie":~J:-A:ir:Temp~ I TemP.: :.: Entrainm'eh.t !- Number
1 6378 5.25 4:45AM 75 91 NA 7075044
2 6379 4.75 5: 50AM 78 89 NA 7075054
3 6380 5.00 7:00AM 78 91 NA 7075065
4 6381 5.25 8:10AM 78 89 NA 7075074
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe. Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr, Mac McClure
(1) Campbell Associates/ Keith E, Atkins
Mr. Randy Pliler KEA/sa/rt
(1 City of Coppell/Building Inspections
(1 City of Coppell/Engineering Dept,
(1 Bear Creek Construcbon/
Mr. Brian Holdgate
(1 Mr. Hank Metzger