Loading...
Northlake 635(5)-LR000224CONCRETE COMPRI IVE STRENGTH Date of Service: Client No.: 02/15/2000 85229000 a d~v~ o£1FIn~mn 8901 ~teF Frwy., Suite #100 ~ Texas 7S247 '11 | I~ I I I I Il Il Report No.:00 . .48 Report Date O2/24/2O(O Project No.: 94991457 Client: Transwestem Property Company Project: Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTRACTOR: Butler Construction CONCRETE SUPPLIER: Pioneer ~,~rr: 22 SPECIFICATION REQUIREMENTS STRENOTm 4000 psi @ 28 Days 5.0" Max 3-5% ASTM C- 143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See placement location PROJECT DATA M~X tO.: 9351 PLACEMENT DATE: 02/15/2000 BATCH T~m: 4:45am T~Vm SAt, O~EO:. 5:15am BY: Steve Campbell WEATIIER CONDITIONS: TEMPERATURE (19 - Am TRUCK NO: 842 Am CONTENT (~): 8.0 PLACEMENT LOCATION: Paving/south of slab Clear 45 F CONCRETE: 56 TICL~:r NO: 503428 vNrr W~IGaT (pO: N/A See attached sketch. REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MARKED SET NO. MEASURED MAXIMUM CO~IVE SLUMP DATE AGE LOAD STRENGTH FRACTURE (inches) TESTED (days) Obs. for~e) (psi) TYPE 1 1 6.00 02/22/2000 7 81070 2870 1 2 6.00 02/22/2000 7 84810 3000 Average 2940 1 3 6.00 03/1412000 28 I 4 6.00 03/14/2000 28 This rcpofl is cxclusivcly for th~ usc of thc client indicated above and shall not bc rcprodueed except in full without th~ wdlten approval of HBC l~nginen~ri~, Inc. OILL Page I of 3 CONCRETE COMPR IVE STRENGTH Date of Service: Client No.: Client: 02/15/2000 85229000 Transwestern Property Company Atto: James Gaspard 12221 Merit Drive, #.450 Dallas TX 75251 Report No.: Project No.: Project: 00~.~. ~. 8 94991457 Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST MWrHOD: . CONTa~CTOR: Butler Construction CONCRETE SUPPLIER: Pioneer ln.~vr: 22 SPECIFICATION REQUIREMENTS ~TH: 4000 psi @ 28 Days 5.0" Max 3-5% ASTM C-143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: S~p~el PROJECT DATA M~X la~.: 9351 PLACEMENT DATE: 02/15/2000 BATCH TIME: 4:55am TIME SAMPLED: 6:00am BY: Steve Campbell WEATHER CONDITIONS: TEMPERATURE (F} - Am TaUCXNO: 847 Am con'rg~ ¢,~): 7.75 PLACi~IEN'r LOCATION: See page I Clear 45 F CONCh: 58 XlcK~r no: 503434 trNrr W~IGHT ~c0: N/A REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXlbIUM COMPRESSIVE bl.&p~En SLUMP DATE AGE LOAD STRENGTH FRA~ SET NO. (inches) TESTED (da~s) (lbs. force) (l~i) TYPE 2 1 7.00 02/22/2000 7 84690 2990 2 2 7.00 02/22/2000 7 87910 3110 Average 3050 2 3 7.00 03/14/2000 28 2 4 7.00 03/14/2000 28 This report is exclusively for U~e use of the client indicated above and shall uot be reproduced except in full without th~ writlgn approval of HBC F,~ in~. 0ILL Page 2 of 3 CONCRETE COMP IVE STRENGTH Date of Service: Client No.: 02/15/2000 85229000 Report No.: 000~.d~.8 Project No.: 94991457 a divU~on of'lSmm:un 8901 CW Ir~-wy., Suite #1~ Report Date 02/24/2000 Client: Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, 0450 Dallas TX 75251 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. SLUMP: AIR: TEST METHOD: CONTIO, erom Butler Construction CONCRETE SUPPLIER: Pioneer rLatcr: 22 $1~CIFICATION REQUIREMENTS s~GTH: 4000 psi @ 28 Days 5.0" Max 3-5% ASTM C-143 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See p~el PROJECT DATA mx l.o.: 9351 PLACI~IENT DATE: 02/I5/2000 BATCH T~IE: 6:30am Ta~ SAMrL~D: 7:15am BY: Steve Campbell WEATHER CONDITIONS: TEMPERATURE O~ - Am TRUCK NO: 842 Am CONTI~NT (%): 4.75 PLACEMENT LOCATION: See page I Clear 56 F CONCRETE: 66 F TIcK~:r NO: 503442 uNIT w~iGwr (~0: N/A REPORT OF TESTS ACCUMULA~ YARD~: 10 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 3 1 7.50 3 2 7.50 DATE 02/22/2000 02/22/2000 MAXIMUM COMPRI~SlVE AGE LOAD STRENGTH (day~) Ot,~. force) (pi) 7 86540 3060 7 87910 3110 Average 3090 FRACTURE TYPE 3 3 7.50 3 4 7.50 Technician: Steve Campbell Report Distribution: (1) Tramwestem Property Company (1) O'Briea & Associates (I) Technistmctures, Inc. ( I ) Butl~ Construction 03/14/2000 03/14/2000 Started: 3:00am (1) City of Coppell (1) City of Coppell 28 28 Finished: 9:00am H~~ring, Inc. Paul D. Smith, P.E. Senior Project Engineer report is exclusively for the use of ~he client indicated above and shall not be reproduced except in full without ~he writ~n approval of HBC OILL Page 3 of 3