121 BP Phase 1-LR 990729 GEOTECHNICALAND I~ F::I r-'l I I F=~
ENVi:~ONMENTAL CONSULTANTS ~
CONCRETE CYLINDER TEST REPORT
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 27
P.O. Box 802047 REG PROJECT NO. 5607
Dallas. Texas 75380-2047 SAMPLE DATE: 07-29-99
ATTN: Mr. John Walsh TECHNICIAN: B. Ray
CONTRACTOR: Westcliffe. Inc.
Location of Sample
Set Number I Location I Quantity Represented
I Bldg.#4 Footings: C/10. C/11, C/12. C/13. C/14. 10/40
C/15. C/16. C/17. C/18, C/19. C/20
Design Information
Source of Concrete I Mix Identification I Specified Strength p.s.i.
Lattimore 38 3000
Test Results
Set ICylinderI I Age@ TotalLoad I Compressive IAverageStrength
No. ID Date Tested Test lbs. Strength p.s.i, p.s.i.
1 6258 08-05-99 7 93500 3310
6258 08-26-99 28 115740 4100
6258 08-26-99 28 113270 4010 4060
6258 Hold
Cylinder Data
[ SetI Cylinder I Time ofI I Concrete Air Ticket
i No. ID Slump Sample Air Temp. Temp. Entrainment Number
;
1 6258 4.75 1:45 PM 100 94 4.0 7074851
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Walsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr, Bennett Foster
(1) Westcliffe. Inc./Mr, Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure Keith E, Atkins
(1) Campbell Associates/ KEA/rt
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger ........
::-'.'.-' ST%TZ ER SJITE 4]] · D-'I.:.AS TX 7EZ2E · -b_L [2'4' 2FC: (~Z · FAX ]2'-']
GEOTECHNICAL -'.ND J J~ F~ I'-'l U [=1
ENV.RONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
121 Business Park - Buildings B-D
601,651,701 and 751 Canyon Drive
Coppell, Texas
REPORTED TO: The Industrial Group REPORT NO. 27
P.O. Box 802047 REG PROJECT NO. 5607
Dallas, Texas 75380-2047 SAMPLE DATE: 07-29-99
ATTN: Mr. John Walsh TECHNICIAN: B. Ray
CONTRACTOR: Westcliffe. Inc.
Location of Sample
Set Number I Location I Quantity Represented
1 Bldg. #4 Footings: C/10. C/11, C/12. C/13. C/14. 10/40
C/15. C/16. C/17, C/18. C/19. C/20
Design Information
JSource of Concrete J Mix Identification J Specified Strength p.s.i.
Lattimore 38 3000
Test Results
Set JCylinderJ Age@ TotalLoadJ Compressive J Average Strength
No. ID Date Tested Test lbs. Strength p.s.i, p.s.i.
1 6258 08-05-99 7 93500 3310
6258 08-26-99 28
J 6258 08-26-99 28
6258 Hold
Cylinder Data
No. ID Slump Sample Air Temp. Temp. Entrainment Number
1 6258 4.75 1:45 PM 100 94 4.0 7074851
Distribution: (1) The Industrial Group/ Submitted by:
Mr. John Welsh
(1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC.
Mr. Bennett Foster
(1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By
(1) The Industrial Group/
Mr. Mac McClure Keith E. Atkins
(1) Campbell Associates/ KEA/rt
Mr. Randy Pliler
(1) City of Coppell/Building Inspections
(1) City of Coppell/Engineering Dept.
(1) Bear Creek Construction/
Mr. Brian Holdgate
(1) Mr. Hank Metzger
Z424 STUTZ DR. · S-J -E 46C · DALLAS -X ?5235 · TEL ~Z'4]