Loading...
121 BP Phase 1-LR 990729 GEOTECHNICALAND I~ F::I r-'l I I F=~ ENVi:~ONMENTAL CONSULTANTS ~ CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 27 P.O. Box 802047 REG PROJECT NO. 5607 Dallas. Texas 75380-2047 SAMPLE DATE: 07-29-99 ATTN: Mr. John Walsh TECHNICIAN: B. Ray CONTRACTOR: Westcliffe. Inc. Location of Sample Set Number I Location I Quantity Represented I Bldg.#4 Footings: C/10. C/11, C/12. C/13. C/14. 10/40 C/15. C/16. C/17. C/18, C/19. C/20 Design Information Source of Concrete I Mix Identification I Specified Strength p.s.i. Lattimore 38 3000 Test Results Set ICylinderI I Age@ TotalLoad I Compressive IAverageStrength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 6258 08-05-99 7 93500 3310 6258 08-26-99 28 115740 4100 6258 08-26-99 28 113270 4010 4060 6258 Hold Cylinder Data [ SetI Cylinder I Time ofI I Concrete Air Ticket i No. ID Slump Sample Air Temp. Temp. Entrainment Number ; 1 6258 4.75 1:45 PM 100 94 4.0 7074851 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr, Bennett Foster (1) Westcliffe. Inc./Mr, Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E, Atkins (1) Campbell Associates/ KEA/rt Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger ........ ::-'.'.-' ST%TZ ER SJITE 4]] · D-'I.:.AS TX 7EZ2E · -b_L [2'4' 2FC: (~Z · FAX ]2'-'] GEOTECHNICAL -'.ND J J~ F~ I'-'l U [=1 ENV.RONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 27 P.O. Box 802047 REG PROJECT NO. 5607 Dallas, Texas 75380-2047 SAMPLE DATE: 07-29-99 ATTN: Mr. John Walsh TECHNICIAN: B. Ray CONTRACTOR: Westcliffe. Inc. Location of Sample Set Number I Location I Quantity Represented 1 Bldg. #4 Footings: C/10. C/11, C/12. C/13. C/14. 10/40 C/15. C/16. C/17, C/18. C/19. C/20 Design Information JSource of Concrete J Mix Identification J Specified Strength p.s.i. Lattimore 38 3000 Test Results Set JCylinderJ Age@ TotalLoadJ Compressive J Average Strength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 6258 08-05-99 7 93500 3310 6258 08-26-99 28 J 6258 08-26-99 28 6258 Hold Cylinder Data No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 6258 4.75 1:45 PM 100 94 4.0 7074851 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Welsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/rt Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger Z424 STUTZ DR. · S-J -E 46C · DALLAS -X ?5235 · TEL ~Z'4]