Loading...
Northlake 635(5)-LR000217IN-PLACE DENSITY TING Date of Service: 02/01/2000 Client No.: 85229000 Client: Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Report No.: Project No.: Project: 0003370 94991457 8901 Carpenter Frwy. Suite #1~ ~, T"**? 7S247 Report Date 02/17/2000 Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: In-place density testing. CONTRACTOR: Butler Construction PROJECT DATA MOISTURE DENSITY RELATIONS: MID No. Description Laboratory T~st M~aod: ASTM D-698 Moistm'e % I Dark brown clay 21.0 100.0 Field Test Method: ASTM D2922 ASTM D3017 Project Requiremeats Mo~tare mmity +3% or above 92% FIELD DENSITY TESTS TEST PROBE LIFT/ M/D NO TEST LOCATION DEPTH ELEV No. MOISTURE DRY DENSITY DENSITY (%) (pO') (% max) Water Injected Subgrade 65 Building line H/2 Final 1 25.6 66 Building line G/3 Final 1 26.0 67 Building line F/4 Final 1 ,24.9 68 Building line E/2 Final 1 24.3 69 Building line E/4 Final I 24.0 Test results on this report meet project specification. 94.7 96.4 93.6 96.1 95.9 NOTE: The above in-place density tests are retests. The orginial in-place density tests passed but it rained on the pad befor the select fill was placed. Second Trip: 5:00 p.m. to 6:00 p.m. Technician: Roy Montgomery ~ Distribution: (1) Transwe~tem Property Company (1) O'Brien & Associates ( I ) Technistrucmres, Inc. (I) Buffer Construction Started: 10:00a (1) City of Copl~ll (1) City of Coppell Finished: 1 l:OOa H~ E~g, Inc. Paul D. Smith, P.E. Senior Project Engineer This report is exclusively for thc usc of the client indicated above and shall not bc reproduced except in full without the written approval of HBC Bngineming, Inc. 07SS Page I of I I -PLACE DENSITY STING Date of Service: 02/07/2000 Report No.: Client No.: 85229000 Project No.: Client: Transwestern Property Company Project: Arm: James Gaspard 12221 Merit Drive, g450 Dallas TX 75251 0003840 94991457 a di~io~ of ~ 8901 Carpenter lrrwy., Suit~ #1~O Dallas, Temm 75~47 I Report Date 02/17/2000 Coppell Commerce Center 1234 Lakeshorc (Bldg. B) Coppell, Texas Services: In-place density testing. CONTRACTOR: Butler Construction MOISTURE DENSITY RELATIONS: PROJECT DATA Lahoratory Test Method: ASTM D-698 Fidd Te~t Method: ASTM D2922 ASTM D3017 Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Dk brown clay 21.5 100.0 +3% or above 92% FIELD DENSITY TESTS TEST PROBE LIFT/ M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION DEPTH ELEV No. (%) (imf) (% max) Water Injected Subgrade 70 Building line J/10 Final 1 24.8 95.6 96 71 Building line J.5/9 Final 1 24.9 94.9 95 72 Building line J/7 Final 1 24.7 94.4 94 73 Building line J.5/5 Final 1 26.0 93.0 93 74 Building line K/3 Final 1 24.8 95.3 95 75 Building line J/1.5 Final 1 25.2 92.9 93 76 Building line L/1.8 Final I 24.9 97.2 97 77 Building line Id3 Final I 24.9 97.0 97 78 Building line K/5 Final I 24.8 96.0 96 79 Building line L.5/6 Final I 25.3 94.8 95 80 Building line K.8/8 Final 1 25.0 95.2 95 81 Building line L.5/10.3 Final 1 25.6 94.1 94 Test results on this report meet project sPecification. This report is exclusively for the use of thc client indicated above and shall not bc reproduced except in full without the written approval of HBC Engineering, inc. 07SDS Page I of 2 REPORT OF DRILLED BELLED PIERS Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B), Coppell, Texas Project No.: 94991457 Report No.: 0004697 Date of Service: 02/17/00 Technician: R. Montgomery Paue: 1 of 1 8901 ~ Fnvy., Suite #100 Dnllas, Toxin 75247 Pier Identification I J9 I_/10 I./11 J/3 J/4 J/6 J/7 .......... Pier Diameter (in.) 24 24 24 24 24 24 24 Bell Diameter (in.) 54 54 54 54 54 54 54 Top of Pier Elevation (ft) 99.0 99.0 99.0 99.0 99.0 99.0 99.0 Req. Depth from Exist. Grade (It) 18.00 18.00 18.00 18.00 18.00 18.00 18.00 Initial Depth of Pier from Existing Grade (It) 18.67 18.58 18.25 18.83 18.33 18.83 18.58 ..... Final Depth of Pier from Existing Grade (it) 18.75 18.58 18.33 18.83 18.33 18.83 18.58 Depth from Top of Concrete (ft) 18.25 18.00 17.67 18.16 17.83 18.25 18.16 Oondition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yse or no) Yes Yes Yes Yes Yes Yes Yes Casing Diameter (in) N/A N/A N/A N/A NIA N/A N/A Cased Depth (ft) NIA N/A NIA NIA N/A NIA N/A Number of Vertical Elam (ea'.) 6 6 6 6 6 6 6 Reinforcing Bar Size (at) 6 6 6 6 6 6 6 Length of Vertical ,Barn (ft.) 17.75 17.50 17.16 17.58 17.33 17.75 17.58 TimeDflllingmCompleted 8:28a.m. 9:00a.m. 8:30a.m. 10:12a.m. 10:26a.m. 10:40a.m. 11:26a.m. Time Concrete waa Placed 10:28a.m. 10:35a.m.! 10:40a.m. 11:08a.m. 11:13a.m. 11:18a.m. 11:42a.m.