Loading...
121 BP Phase 1-LR 990723 GEOTECHNICAL AND ~ F=;I ~ U ~ ENV:RONMENTAL CONSULT~'.NTS j CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 18 P.O. Box 802047 REG PROJECT NO. 5607 Dallas. Texas 75380-2047 SAMPLE DATE: 07-23-99 ATTN: Mr. John Walsh TECHNICIAN: D. French CONTRACTOR: Westcliffe. Inc. Location of Sample Set Number t Location t Quantity Represented 1 Bldg.#2 Grade Beam E-8 20/20 Design Information Source of Concrete I Mix Identification Specified Strength p.s.i. Lattimore 38 3000 Test Results Set ICylinderI Age@ ]TotalLoad Compressive IAverageStrength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 1 6025 07-30-99 7 82020 2900 6025 08-20-99 28 87880 3110 6025 08-20-99 28 89990 3180 3150 6025 Hold Cylinder Data No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 6025 5.00 3:20 PM 98 96 N/A 3088505 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe. Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/sa/rt Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ Mr. Brian Holdgate (1) Mr. Hank Metzger ~='2-' S-L,-Z ].'~ S~ -E -1Z- · 2;-'.__~S TX -F23'7 · TE_ ]2'z] 35C ~".':2' · FAX ]2'4'