Loading...
121 BP Phase 1-LR 990720 GEOTECHNICAL AND EN¥1RON,~ENTAL CONSULTANTS REPORT OF FIELD DENSITY TESTS 121 Business Park - Buildings B-D 601,651,701 and 75'1 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 13 P.O. Box 802047 REPORT DATE: 07-20-99 Dallas, Texas 75380-2047 REG PROJECT NO. 5607 ATTN: Mr. John Walsh TECHNICIAN: B. Ray PAGE: 1 of 1 CONTRACTOR: Westcliffe, inc. Proctor ASTM Optimum I Maximum No. Standard Description Moisture, % I Density, PCF 1 D-698 Reddish brown sandy clay w/gravel 9.0 127.0 2 D-698 Dark brown day w/organics 14.0 107.5 3 D-698 Light brown sand w/trace clay and organics 9.5 117.5 4 D-698 Reddish brown sand w/gravel 10.5 115.0 Depth Below Field Field Test Final S. G. Density Moisture Proctor Compaction No. Date Location (feet) (pcf) (%) ID Level (%) 6! 07-06-99 Bldg. Pad: 140'S. 40'W (1) 0.0 112.8 8.4 4 98.0 62 Bldg,Pad: 140'S, 80'W (1) 0.0 110.0 9.4 4 95.6 63 Bldg. Pad: 60'S, 40'W (1) 0.0 122.4 9.4 1 96.4 64 Bldg. Pad: 60'S, 80'W (1) 0.0 123.6 9.8 1 97.3 65 Paving SG: 40'N, 60'E (2) 0.0 111.4 9.4 4 96.9 66 Paving SG: 40'N, 160'E (2) 0.0 112.4 8.8 4 97.7 67 Paving SG: 40'N, 260'E (2) 0.0 110.8 8.4 4 96.3 68 Storm Line B, STA. 1+20 4.5 123.1 9.3 1 96.9 69 Storm Line B, STA. 2+30 1.5 122.4 9.0 1 96.4 70 Sanitary Line B? STA. 1+00 2.0 121.8 8.5 I 95.9 71 San:,tary Line D. STA. 1-,'-00 I .O 122.7 8.7 1 96.6 72 Sanitary Line B, STA. 2+50 2.0 121.8 12.8 1 95.9 73 Sanitary Line B, STA. 2+50 1.0 123.8 11.0 1 97.5 Comments: Where tested, materials were in compliance with project specifications. Footnotes: (1) Measurements referenced from N.E. corner of building 5. (2) Measurements referenced from N.W. corner of building 3. Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates: REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc,/Mr. Charlie Johnson (1) The Industrial Group/ Original Signed By Mr. Mac McClure (1) Campbell Associates/ Ronald F. Reed, P.E. Mr. Randy Pliler (1) City of Coppell,.'Building Inspections BW/sa/je (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ .......... Mr. Brian Holdgate .'zZ'.: _:.T_ _ .1:'. · ~..I 'b -:?~' · 2-'__.~ -' '""3~