Loading...
121 BP Phase 1-LR 990719 GEOTECHNiCAL .-'.ND I~ F;l r~ I I p ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT 121 Business Park - Buildings B-D 601,651,701 and 751 Canyon Drive Coppell, Texas REPORTED TO: The Industrial Group REPORT NO. 15 P.O. Box 802047 REG PROJECT NO. 5607 Dallas, Texas 75380-2047 SAMPLE DATE: 07-19-99 ATTN: Mr. John Walsh TECHNICIAN: B. Ray CONTRACTOR: Westcliffe, Inc. Location of Sample Set Number I Location I Quantity Represented 1 Bldg.#2 Footing 20/80 Design Information ISource of Concrete I Mix Identification I Specified Strength p.s.i. Lattimore 38 3000 Test Results Set ICylinderI I Age~ TotalLoad Compressive IAverageStrength No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. I 5853 07-26-99 7 75710 2680 5853 08-16-99 28 101070 3580 5853 08-16-99 28 97400 3450 3520 5853 Hold Cylinder Data Set I Cylinder Time of Concrete I Air Ticket No.I ID Slump Sample Air Temp. Temp.I Entrainment Number 1 5853 4.50 2:00 PM 88 92 4.2 3088097 Distribution: (1) The Industrial Group/ Submitted by: Mr. John Walsh (1) Gromatzky Dupree & Associates/ REED ENGINEERING GROUP, INC. Mr. Bennett Foster (1) Westcliffe, Inc./Mr. Charlie Johnson Original Signed By (1) The Industrial Group/ Mr. Mac McClure Keith E. Atkins (1) Campbell Associates/ KEA/sa/rt Mr. Randy Pliler (1) City of Coppell/Building Inspections (1) City of Coppell/Engineering Dept. (1) Bear Creek Construction/ (1) Mr. Hank Metzger Mr. Brian Holdgate 2-'24 S-U~Z DR EL -= z.~'.~, · DALLAS ~X 75235 · -EL ~21:' 25-- 5OCC * FAX [2'4]