Kimbel 9R-CS 961125 Coppell, Texas 75019
~ The City With A Beautiful Future 214-462-0022
November 25, 1996
Charlie Wright
Nortex Pizza, L.P.
829 E. Woodglen
Copper Canyon, TX 75067
RE: Minor Plat for Kimbel Addition, Lot 9-R (Papa Johns)
Development Fee Assessment
Dear Mr Wright:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please maize payment to the City of Coppell in the amount of $5,878.10 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to ~ paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our offic
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Since. rely, 0
Assistant City Manager/City Engineer
cc: Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
DEVELOPMENT FEE TABLE
Project: Minor Plat for Kimbel Addition, Lot 9-R (Papa Johns)
Date: 11/25/96
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $3,375.00 $3,375.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $100.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $48.30
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $134.93
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Firclinc Meter Deposit $35.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $1,125.00 $1,125.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $1,378.10 $1,378.10
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $6,326.33
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $5,878.10
DEVELOPMENT FEE WORKSHEET
PROJECT: Minor Plat for Kimbel Addition, Lot 9-R (Papa Johns)
DATE: 11/25/96
Water Impact Fee:
Domestic Meter(s): 1 - I inch = 2.5 ESU's
Irrigation Meter(s): 1 - 1 1/2 inch = 5 ESU's
= ESU's
Fireline Meter(s): 0 - N/A = ESU's
Total #: 7.5 ESU's @ $450.00 ea. $3,375.00
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 2 Connections @ $50.00 ea. $100.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 1 Domestic Meter{s) @ $48.30 $48.30
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 1 Irrigation Meter(s) @ $134.93 $134.93
Total #: 0 Additional Irrigation Meter{s) @ $0.00
Total #: 0 Fireline Meter(s) @ $0.00
(100% due prior to issuance of water meters)
Water Meter Deposit Fee (Domestic):
Total #: 1 Meter(s) @ $30.00 ea. $30.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 1 Meter(s) @ $35.00 ea. $35.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU' 2.5 @ $450.00 ea. $1,125.00
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea. $50.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea. $50.00
(100% due prior to issuance of building permit)
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A Single-family @ $150.00 / Lot N/A
N/A Multi-family @ $75.00 / Unit N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A Single-family @ $350.00 / Lot N/A
N/A Multi-family @ $350.00 / Unit N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
N/A Single-family @ $1285.00 / Lot N/A
N/A Multi-family @ $1285.00 / Unit N/A
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations) $1,378.10
Street Lighting Fees: Information not
Assessed for lighting in the City's right-of-way, available at this time
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees: Information not
Assessed for signage in the CiW's right-of-way, available at this time
(See attached fee calculations if applicable)
Construction Inspection Fees: Need submittal of
A copy of the development contract must be submitted for assessment, development contracts
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Minor Plat for Kimbel Addi~'on, Lot 9-R (Papa Johns)
DATE: 11/25/96
ROADWAY IMPACT FEE:
Service Area * 3
Category ** Commercial
Land Use ** Fast Food Restaurant
Buildin~ Size (Sq. Ft.) 1,262
Development Units ** 1.262
Vehicle Miles per Development Unit ** 3.64
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
i(¥ehicle Miles per Development Uni0 x (Fee per Vehicle Mile) = $1,378.10
· (Figure 2 - Roadway Impact Fee Study)
· * (Table 3 - Roadway Impact Fee Study)
· ** (Schedule 2, Page 3 - Roadway Impact Fee Study)