Loading...
Northlake 635(5)-LR000202E N-PLACE DENSITY ( STING Date of Service: Client No.: Client: 01/25/2000 85229000 Transwestern Property Company Attn: James Gaspard 12221 Merit Drive, 8450 Dallas TX 75251 8901 Carp~ater IN'wy. ~tit~ #100 Report No.: 0002810 Project No.: 94991457 Report Date 02/02/2000 Project: Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Services: In-place density testing. CONTRACTOR: Butler Construction MOISTURE DENSITY RELATIONS: M/D No. Description PROJECT DATA Laboratory Test Methml: ASTM D-698 Moisture 1 2 Dk brown clay Lt. brown & tan shaley clay 21.5 22.0 Maximum l)ensity pct' 100.0 98.5 Field Test Method: ASTM D2922 ASTM D3017 Project R~lnle~m~t~ Moisture Density +3% or above 92% +3% or above 92% FIELD DENSITY TESTS TEST NO TEST LOCATION Water Injected Bldg Pad 39 Building line F/2.5 40 Building line G.5/3 41 Building line H.5/2 42 Building line J/1.5 43 Building line K.5/1.5 44 Building line L/3.3 45 Building line L/5 46 Building line L/7 47 Building line L/8.5 48 Building line L/11 49 Building line J.5/11 PROBE LIFT/ M/D DEPTH ELEV No. MOISTURE DRY DENSITY DENSITY (%) (pc0 (% max) Final 1 24.8 95.2 95 Final I 25.9 92.0 92 Final I 27.1 92.0 92 Final 1 24.5 97.8 98 Final 1 27.4 92.3 92 Final 1 25.7 94.3 94 Final 1 25.5 92.9 93 Final I 25.9 92.5 93 Final 1 24.5 95.3 95 Final 1 26.5 92.1 92 Final 1 26.3 94.8 95 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07SDS Page I of 2 l~eport No.: 0002810 T~ST NO TEST LOCATION PROBE LIFFI M/D DEPTH ELEV No. 50 Building line J/8 51 Building line J/6 52 Building line J/4.5 53 Building line J.5/4 54 Building line J.3/2 55 Building line K/7 56 Building line K/10 Moisture Conditioned Bldg Pad 57 Building line C.5/2, northwest comer of building pad 58 Building line C.8/4.3, northwest comer of building pad 59 Building line D.5/1.8, northwest comer of building pad 60 Building line D/4, northwest comer of building pad lie: MOk~TURE DRY DEN~n'Y Ol~3[i~ (%) (pd) (% max) Final 1 25.4 94.3 94 Final 1 27.1 92.0 92 Final 1 24.8 95.4 95 Final 1 27.0 92.6 93 Final 1 25.7 94.0 94 Final 1 26.7 93.4 93 Final 1 28.0 92.0 92 6th 2 25.6 92.6 94 6th 2 26.0 91.4 93 7th 2 25.5 92.3 94 7th 2 25.3 93.8 95 Test results on this report meet prOject specification. Fkid Results Reported To: Everett w/Bulter Construction Technktan: Roy Montgomery Report Distribution: (I) Transw~stem Property Company (1) O'Brien & Associates ( I ) Technisttuctures, Inc. (I) Butler Construction Started: 12:00p (1) City of Coppell (1) City of Coppell Finished: 2:00p ~ En~g, Inc. Paul D. Smith, P.E. Senior Project Engineer This report is exclusively for the use oftbe client indicated above and shall not be reproduced except in full without the written approval of HBC Engineerins, Inc. OTSDS Page 2 of 2