Loading...
Northlake 635(5)-LR000126IN-PLACE DENSI STING Date of Service: Client No.: Client: 01/14/2000 85229000 Transwestem Property Company Attn: James Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Report No.: Project No.: Project: 0001960 94991457 8901 Carpem~ lq'wy. Suite I IIIIIIII II Report Date 01/26/2000 CoppeH Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas ServiCeS: In-place density testing. CONT~C'I~R: Butler Construction PROJECT DATA Laboratory Test Method: ASTM D-698 MOISTURE DENSITY RELATIONS: Mo~ture ~$ I Lt. brown & tan shaley clay 22.0 FieM Test Methad: ASTM D2922 ASTM D3017 98.5 +3% or above 92% FIELD DENSITY TESTS TEST NO T~qT LOCATION PROBE LIFT/ DEPTH ELEV M/D MOISTURE DRY DENSITY DENSITY No. (%) Q,cf) ('m mm0 Moisture Conditioned Bldg Pad 23 Grid line B/3 24 Grid line B.5/4 25 Grid line A.8/2 26 Grid line B.3/3.6 27 Grid line C.5f2.5 28 Grid line D.3/4.0 7th I 26.0 91.0 92 7th I 25.8 92.8 94 8th I 26.8 91.8 93 8th 1 26.3 91.4 93 Subgrade I 27.0 91.1 93 Subgrade I 26.4 93.0 94 Test results on this report meet project specification. Second Trip: 12:30 p.m. to 1:30 p.m. Third Trip: 4:00 p.m. to 5:30 p.m. lti~l lta~ults Reported To: Contractor T~: Roy Montgomery (I) Tnmswestern Propexxy Company (1) O'Brien & Associa~ (!) Teclmistructures, Inc. (1) Butler Construction Start~l: 7:30a (1) City of Copp~ll (1) City of Coppell Finished: 8:30a Paul D. Smith, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full ~ the writte~ apl~oval ofHBC F. ngim~m~ Inc. IN-PLACE DENSITY C)STING Date of Service: 01/12/2000 Client No.: 85229000 Client: Transwestern Property Company Atto: Jamos Gaspard 12221 Merit Drive, #450 Dallas TX 75251 Report No.: Project No.: Project: 0001846 94991457 Ddm, T~m ?S24'7 H Report Date 01/26/2000 Coppell Commerce Center 1234 Lakeahore (Bldlb B) Coppell, Texas Services: In-place density testing CONTRACTOR: Butler Construction MOISTUR~ D~N~TY I~aLATION$: M/D No. l~a'lption PROJECT DATA Laboratory Test Me~od: ASTM D-698 1 Lt. brown & tan shaley day Matsture % 22.0 Fidd T~st Method: ASTM D2922 ASTM D3017 98.5 ProJoct Requlremmda Mebmro l),mity +3% or above 92% FIELD DENSITY TESTS ~ PROBE LIFT/ NO Tier LOCATION DKI~'H EI~V No. MOI~TUR~ DRY DKNSITY DBI~--ITY ~) ~ O~ maz) Moisture Conditioned Bldg Pad 11 Grid line B/1.8 1st 1 26.0 12 Grid line B/3 1st I 26.8 13 Grid line B.5/1.5 2nd I 26.2 14 Grid line B.5/4 2nd 1 25.4 Test result~ on this report meet project specification- 92.8 94 93.4 95 93.8 95 95.1 97 Second Trip: 10:30 a.m. to 12:00 p.m. Technicbn: Roy Montgomery R~port Distribution: (1) Trmswe~em l~pmy Ccmpmy (1) ~ & Associates (1) Tedmi~_ _~_ ~s, Inc. Started: 7:30a (1) City er CoppeU (1) city d coppdl Finished: 8:30a En Inc. Paul D. Smith, P.E. Smi,x Ptoj~t ~ This report is ~ciusivdy t~' the use ~the ciimt indicated above md dudl n~ be repr°duced e~h~~~~~ Page I of 1