Loading...
Northlake 635(5)-LR000125WATER INJECTION OBSERVATION Date of Service: Client No.: Client: Location: 01/25/00 85229000 Transwestem Property Company 12221 Merit Drive, ~450 Dallas, Texas 75251 Building pad Report No.: Project No.: Project: General Contector: Injector: 0002771 94991457 Coppoll Commeroo Ceater 1234 Lakeshore (Bldg. B) Coppell, Texas Buffer Construction Procedure: On thi.~ date, a representative of HBC Engineering, Inc. observed the injection of water at site. During the injection process, the following observations were recorded. Pass No.: 8th No. of Probes: 4 Probe Ler~gth: 10 feet OBSERVATION SPECIFICATION Yes No NIA Surfactant added to each load. X Injection pressure 50 to 200 psi at mznifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maxlmnm_ X Inj_~ction to rerun! at each location. X Comments: Noxth half of pad. v~: D. Phmips T. Smi~ (1) T~-=n Property Company (1) O~deo & A~r~Btes (1) Technidnigtures. Inc. (1) BuUer Co~ Started: 6:30 a.m. (1) c~y of (1) CibJ of ~ mopped: 1:30 p.m. Engineering, Inc. Paul D. Smith, P. E. gOdp Thi~ repmt ia exdu~ively for the u~e el' the dier~ indicated above and aha# not be reproduced in full vdthout v~it~en approvel ef HBC Engtneedng, Inc..