Loading...
Northlake 635(5)-LR000120 © WATER INJECTION OBSERVATION Date of Service: Client No.: Client: Location: 01/20/00 85229000 Transwestern Property Company 12221 Merit Drive, ~450 Dallas, Texas 75251 Building pad Report No.: Project No.: Project: General Contector: Injector: ~1 ~tq~tt~lbau~, hb 1# 0002452 94991457 Coppel] Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Butler Construction Procedure: On thLq date, a representative of HBC Engineering, Inc. observed the injection of water at thin site. During the injection process, the following observations were recorded. Pass No.: 6th No. of Probes: 4 Probe Length: l0 feet OBSERVATION SPECIFICATION Yes No NIA Slll'fact_ant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in,.,.18 inch intervals. X Total depth of injection was 10 feet. X .... SpacinE of injection was 5 feet maximnm X In~__,~ion to refi~_! at each lo~a6on. X ,, Comments: North half of pad. Technician: D. Phillips T. Smith I~nnt I~.attmtion: (1) Trmuwe~em Property Company (1) O'Brlen & Assoc~t~s (1) Technistructures, Inc. (1) euaer Construction Started: 6:30 a.m_ (1) City of Coppell (1) City of Coppetl stopp~: 5:30 p.m_ Paul D. Smith, P. E. ggdp This report is e~-quaively for the use a~ the client indicated above and shall not be repre,3___-ced_ in full ~nithout ~ approval al' I-IBC Engineming, in~ WATER I NJ ECTION OBSERVATION Date of Service: Client No.: Client: Location: 01/20/00 85229000 Transwestern Property Company 12221 Merit Drive, 0450 Dallas, Texas 75251 Building pad Report No.: Project No.: Project: General Contactor: Injector: 0002453 94991457 Coppell Commerce Center 1234 Lakeshore (Bldg. B) Coppell, Texas Buffer Construction Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at thi.~ site. During the injection process, the following observations were recorded. Pass No.: 5th No. of Probes: 4 Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No NIA Surf~ctAnt added to each load. X Injection pressure 50 to 200 psi at m~nifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spa_cin~ of injection was 5 feet maxim.m X Inje~ion to re_~! at o~_ch location. , X Comments: North half of pad. Technician: D. Phill~s T. Smith (1) Tmrmweetem Propeety Company (1) O~rlen & Assoc~es (1) Tech~~, Inc. O) euUer Construction stm~: See Report #0002452 (1) City of Coppell O) c~y or cop~; Paul D. Smith, P. E. S ior This report is exclusively for the use ~ the client indicated above and shall not be reproduced in full ~(~hout w~ten appro~l ef I-IBC Engineering, Inc.