Loading...
Northlake 635(5)-LR 991230Date of Service: Client No.: Client: 12/30/99 85229000 TranswestemPropertyCompany 12221MeritDrive,//450 Dalla~ Texas 75251 Building pad Repo~ No.: Pr~ectNo.: Pr~ecC General Contactor: Injector: 9934885 94991457 Coppell Commerce Center 1234 Lake~ore (Bldg. B) Coppell, Texas Butler Construction Procedure: On thi.~ date, a representative of HBC Engineering, Inc. observed the injection of water at thi. site. During the injection process, the following observations were recorded. Pass No.: 4th No. of Probes: 2 Probe Length: 10 feet oBSERVATION SPECIFICATION Yes No NIA Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. See Comm~llt~ Spacing of injection was 5 feet maximnm_ X Injection t,o refu,~l at each location. X Comments: North half of pad. In some places, limestone boulders were encountered in the fall at depths less than 10 feet. Technician: D. Phil!'.ms T. Smith (1) Transwestem Property Company O) O'Br~ a ~ (1) T~ures, Inc. (1) ButU.' Construction street: 6:30 a.m. (1) City of Coppall (1) c~y of cop~ Stopped: 5:30 p.m. Paul D. Smith, P. E. s~~~ 90dp This report is exclusively for the use ~f the client indicated above and shall not bo mgwoduc~l in full without ~Hlten aplxovel ef I-IBC Engineering, Inc.