Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Old Coppell Est-LR 951212
~0- CO.~ULTING ENGINEERS INS '~r~e .nvironmentat Assessments ~ Soils & Fou~ations Construction Hateria[s Testing "Excellence ~ Ex~ie~e" C~rciat & l~ust~ia[ Ins~ction PO Bo; 9R548 · SouthtaK-. Texas T6OgA · (817) 329-0281 -- CONCRETE CYLINDER ,':=~,,m J.~S, RESULTS PROJECT: Old Coppell Estates LOCATION: Coppell JOB #: 95-1479 DATE OF BREAK: 12-12-95 DAY: Tuesday CLIENT: WPC-Bethel Dev Corp CONTRACTOR: Site Concrete c/o Wilbow Corporation I.D. LOCATION (IN.) SAMPLE AGED POUNDS PSI Hearthstone (east): 8C @ Station 3+47 5~ 5" ].1-14-95 28 112,500 3979 8D @ Station 3+47 5.5:' !]--~4-95 28 ~ 11,000 3926 Hearthstone (west): 9C @ Station 3+85 6.0" 11-14-95 28 116,500 4121 9D @ Station 3+85 6.0" ].1.-14-95 28 115,000 4068 SPECIFICATIONS: 3000 psi @ 28 days SUPPLIER: Site Concrete Patrick Corbett Technician