Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Old Coppell Est-LR 951124
I~~~ Environmental Assessments ~!~, Soils & Foundations Construction Hateria[s Testing "ExcetLencebyExperience" Commercial & Industrial inspection PO Box 9Z548 · South[ake, Texas 7609Z · (817) 32g-0~81 CONCRETE CYLINDER TEST RESULTS PROJECT: Old Coppell Estates LOCATION: Coppell JOB #: 95-1479 DATE OF BREAK: 11-24-95 DAY: Friday CLIENT: WPC-Bethel Dev Corp CONTRACTOR: Murray Construction c/o Wilbow Corporation CYL. SLUMP DATE OF DAYS I.D. LOCATION (IN.) S~MPLE AGED POUNDS PSI Storm Drain: 10A @ NE headwall 10-27-95 28 untestable 10B @ NW headwall 10-27-95 28 untestable 10C @ NW headwall 10-27-95 28 123,000 4351 SPECIFICATIONS: 3000 psi @ 28 days SUPPLIER: Jamie Holden Technician