Old Coppell Est-LR 951114 5nvf ronmentai Assessments
X~, Soi ts & Foundations
Construction HateriaLs Testing
"Excettence by Experience" Comnercia[ & industriat Inspection
PO Box 92548 · South[ake, Texas ?6092 · (817) ]29-0281
DAILY CONSTRUCTION REPORT
PROJECT: Old Coppell Estates LOCATION: Coppell
JOB #: 95-1479 DATE: 11-14-95 DAY: Tuesday TIME: 7am-12:30pm
CLIENT: WPC-Bethel Dev Corp CONTRACTOR: Site Concrete
c/o Wilbow Corporation
ACTIVITIES:
WEATHER: Clear LOW TEMP: 42F HIGH TEMP: 68F
Travelled to job site, as requested, to make eight (8) concrete
test cylinders and to pick up twelve (12) test cylinders made on
11-13-95. Returned to office.
SET #~
LOCATION: Hearthstone (east) @ Station 3+47
SLUMP: 5.5" AIR: 5.0% TEMP: AT 64/CT 72 TIME: 8:30am
SET #9
LOCATION: Hearthstone (west) @ Station 3+85
SLUMP: 6.0" AIR: 5.0% TEMP: AT 67/CT 73 TIME: 10:30am
Note: Also picked up three (3) concrete test cylinders made
on the storm drain headwall by Murray Construction on
10-27-95.
Glenn Hutchinson
Technician