Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Old Coppell Est-LR 951102
~- CO'""ULTING ENGINEERS T~(~rJ~Q~e Environmenta[ Assessments ~* Soits & Foundations Construction Hateria[s Testing "Excellence by Experience,, Co~mercia[ & Industrial Inspection PO Box 92548 · South[ake, Texas ?6092 · (817) 329-0281 CEMENT SUBGRADE GRADATION REPORT PROJECT: Old Coppell Estates LOCATION: Coppell JOB #: 95-1479 DATE: 11-02-95 DAY: Thursday TIME: l:30pm CLIENT: WPC-Bethel Dev Corp CONTRACTOR: Site Concrete c/o Wilbow Corporation % PASSING % PASSING % PASSING LOCATION 1" SIEVE 1/2" SIEVE #4 SIEVE Hearthstone Ln (north): 1. @ Station 1+00 100.0% 79.4% 55.7% 2. @ Station 4+00 100.0% 83.6% 52.8% Hearthstone Ln (west): 3. @ Station 0+50 100.0% 72.1% 46.3% 4. @ Station 3+50 100.0% 80.2% 54.8% Hearthstone Ln (east): 5. @ Station 0+50 100.0% 74.7% 47.2% 6. @ Station 3+50 100.0% 77.3% 49.9% Hunterwood Ct: 7. @ Station 1+00 100.0% 82.5% 55.4% SPECIFICATIONS: 100.0% Passing 1" Sieve 70.0% Passing 1/2" Sieve 45.0% Passing #4 Sieve REMARKS: Also collected two (2) soil samples for Cement-Treated Moisture-Density Relations $4 and $5 at same time. Jeff Holden Technician ~- CO~ULTING ENGINEERS [N[ T~~URe Environmental Assessments ~, Soils & Foundations Construction MateriaLs Testing "Excet[encebyExperience" Coraaercia[ & industrial Inspection PO Box 92548 · South[ake, Texas 76092 · (817) 329-0281 CONCRETE CYLINDER TEST RESULTS PROJECT: Old Coppell Estates LOCATION: Coppell JOB #: 95-1479 DATE OF BREAK: 11-02-95 DAY: Thursday CLIENT: WPC-Bethel Dev Corp CONTRACTOR: Murray Construction c/o Wilbow Corporation CYL. SLUMP DATE OF DAYS I.D. LOCATION (IN.) SAMPLE AGED POUNDS PSI 2A @ inlet bottom 10-26-95 7 97,500 3449 SPECIFICATIONS: 3000 psi @ 28 days SUPPLIER: Jamie Holden Technician