Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Old Coppell Est-LR 950927
FIELD COMP~X~TXON REPORT PROJECT= Old Coppell Estates LO~ATION; Coppe11 JOB ~: 95-1479 DATE= 09-27-95 DAY: Wednesday TIME: 11:00am CLIENT: WPC-Bethel Der Corp CONTRACTOR: Site Concrete c/o Wilbow Peck Corporation WATER DRY PER- TEST PROCTOR CONTo DEN CENT NO. LOCATION ~ND LIFT NUMBER (%) (DCF) COMP Block 1: 1. @ Lot i 1st Lift i 14.8 100.4 97.0 2. @ Lot '2 FG 1 15.7 101.4 97.9 3. @ Lot 3 1st Lift i 15.6 100..8 97.3 4. @ Lot 4 FG 1 16.6 99.6 96.2 5. @ Lot 5 1st Lift 1 16.7 101.4 97.9 6. @ Lot 6 FG I 17.4 99.4 96.0 7. @ Lot 7 1st Lift 1 17.4 101.7 9'8.2 8. @ Lot 8 FG I 16.5 100.1 96.7 9. @ Lot 9 1st Lift 1 1§.3 102.0 98.5 10. @ Lot 9 FG i 16.4 100.7 97.2 RJeM~2~RKS-. All tests passed. Minimum Compaction Required: 95% FG = Final Grade PROCTORS-. 1. Brn & Tn Sandy Clay 103.5 PCF @ 16.0% MOISTURE Patrick Corbett Technician ~:0 'd ~' :60 ]']0]4 ci6-;~O-lO0