Loading...
Northlake 635(5)-LR 991228WATER INJECTION OBSE ATION Date of Service: Client No.: Client: Location: 12/28/99 85229000 TranswestemPropertyCompany 12221MeritDrive,~50 Dalla~ Texas 75251 Building pad Report No.: Project No.: Project: General Contactor: Injector: 9934664 94991457 Coppen Commerce Center 1234 Lakeshbro (Bldg. B) Coppell, Texas Butler Construction Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection ofwater at this site. During the injection process, the following observations were recorded. Pass No.: 2nd No. of Probes: 2 Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No NIA Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch inte~als. X Total del~th of injection was 10 feet. See Comments Spacin~ of injection was 5 feet maximnm_ X Injection to refusal at each location. X Comments: North half of pad. In some phces, limestone boulders were encountered in the fill at depths less than 10 feet. Technician: D. Phill'.ms T. Smith Report I~ribution: (1) Tranawestsm Propa~ Company (1) O'Brten 8, Associ~es (1) Technistruc~es, Inc. (1) eu~ C. omtruct~. Stmed: 6:30 a.m. c~ of com~ city of coppa~ stov~a: 5:30 p.m. Engineering, Inc. Paul D. Smith, P. E. ggdp This report is exclusively for the use e~ the orient indicated above and ~hall not be reproduced in full 'Wahout e~'itten aplxowd ~ I-IBC E~ineedng, Inc.