Loading...
Northlake 635(5)-LR 991227WATER INJECTION OBSERVATION Date of Service: Client No.: Client: Location: 12/27/99 85229000 Transwestem Property Company 12221 Merit Drive, ~450 Dallas, Texas 75251 Building pad Report No.: Project No.: Project: General Contactor: Injector: 9934534 94991457 Coppell Commorce Center 1234 Lakesl/ore (Bldg. B) Coppell, Texas Butler Construction Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at site. During the injection process, the following observations were recorded. Pass No.: 1st No. of Probes: 2 Probe Length: 10 feet OBSERVATION SPECIFICATION Yes No NIA Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. See Commettta Spacing of injection was 5 feet m~mllm X Injection to refusal at each location. X Comments: North half of pad. In some places, limestone boulders were encountered in the fill at depths less than 10 feet. Technician: D. Phill'.ms T. Smith (1) Tmnsw~tem Property Company (1) O'Bden & Associates (1) Technistn~:tures, Inc. O) euUer construcUm stmed: 7:00 a.m. (1) c~ of O) city of copp~ 5:30 p.m. Paul D. SmitE, P. E. se~or Proj~t P~%~r ggdp This report is exclusively for the use ~f the client indicated above and shall not bo reproduoed in full v~ilhout vwitten apflrmml ef I-IBC Engineering. Inc.