Loading...
Park 'N Fly-CS 940510/ Coppell. Texas 75019 The City With A Beautiful Future 214-462-0022 May 10, 1994 Mr. Mike Daniel, P.E. Nathan D. Maier Three Northpark 8800 N. Central Expwy., Suite 300 Dallas, TX 75231 RE: Park & Fly Development Fee Assessment Dear Mr. Daniel: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for Park & Fly. Please provide a check made payable to the City of Coppell in the amount of $9,550.00 and forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the Fee Assessment List. Please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. By providing a copy of your paid receipt to our office, it will help us to verify payment of the required fees and insure a successful beginning of this project. to working with you on this project. If you have any questions, please We look forward hesitate to contact me. Sincerely, F ~'~!~ .~ ! Kenneth M. Griffin, P.E. ~ Assistant City Manager/City Engineer ~ ;'? _~_~ cc: Steve Goram, Director of Public Works C D S L.~-- Alan Johnson, Acting Finance Director ~ ....... Greg Jones, Building Official ( ......... '~..~:z~x Doug Stevens, Engineering Technician CITY OF COPPELL DEVELOPMENT FEES Date: May 10, 1994 Project: Park N' Fly TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $ 9,100.00 $ 9,100.00 (100% due prior to Council Approval) Water Tap Inspection Fee $ 400.00 -0- (100% due at Issuance of Building Permit) Wastewater Impact Fee $ 450.00 $ 450.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee -0- -0- (100% due at Issuance of Building Permit) Utility Final Inspection Fee $ 50.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) $ 22.25 -0- (100% due at Issuance of Building Permit) Water Meter Deposit (Non-residential) $ 140.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Irrigation & Fire) $ 2,865.90 -0- (100% due at Issuance of Water Meters) Irrigation Meter Deposit -0- -0- (100% due at Issuance of Water Meters) Street Sign Fee -0- -0- (100% due prior to Acceptance of Project) Street Light Fee * information not -0- (100% due prior to Acceptance of Project) available Park Fee -0- -0- (50% due prior to Council Approval) (50% = ) (50% due prior to Issuance of Building Permit) (50% = ) Construction Inspection Fee need submittal of -0- (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $ 13,028.15 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 9,550.00 * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPELL PUBLIC WORKS MEMORANDUM DATE: April 22, 1994 TO: Engineering Department FROM: Public Works Staff RE: Development Fees for Park & Fly The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 1 - 5/8" x 3/4" Domestic Meter/s = 1 ESU's 1 - 2" Irrigation Meter/s = 8 ESU's 2 - 6" Fireline Meter/s = 5 ESU's Total 14 ESU's ~ $650.00 ea = S 9,100.00 100% due prior to Council approval of the final plat. Wastewater Impact (City) 1 - 5/8" x 3/4" Domestic Me~er/s = 1 ESU's Total 1 ESU's ~ $450.00 ea = $ 450.00 100% due prior to Council approval of the final Plat. Water Tap Inspection Fee 4 Connections ~ $100.00 each = $ 400.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee Connections ~ $100.00 each = $ 100% due prior ~o issuance of building permit. (Residential only) Development Fees Page 2 Utility Final Inspection Fee (Ail Development) 1 lots ~ $50.00/!ot = $ 50.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 1 - 5/8" x 3/4" Domestic Meters ~ 22.25 ea = $ 22.25 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 1 - 2" Irrigation Meter/s ~ $ 188.10 ea = $ 188.10 2 - 6" Fire!ine Meter/s ~ $ 1338.90 ea = $ 2,677.80 Total = $2.865.90 100% due prior to issuance of water meter/s. Water Meter Deposit (Residential) Meters @ $30.00 ea = S 100% due prior to issuance of building permit. Water Meter Deposit (Multi-Family or Non-Residential) 4 Meters ~ $35.00 ea = S 140.00 100% due prior to issuance of water meters. Irrigation Meter Deposit Meters ~ $35.00 ea = $ 100% due prior to issuance of water meters.