Old Coppell Est-CS 950823 (2)August 23, 1995
Mr. Roger D. Dietz, P.E.
GDI & Associates, Inc.
555 Republic Drive., Suite 201
Piano, Texas 75074
RE: Old Coppell Estates
Construction Plans
Dear Mr. Dietz:
The City of Coppell has received and reviewed the referenced plans and has the following comments
to offer:
1. Provide 8 foot wide brick paver band at streets intersecting Bethel Road.
2. Provide detail for asphalt transition. Need 6" stabilized subgrade, 4" Type B hot mix and
2" Type D hot mix.
3. ADA ramps need to be constructed at all street intersections by the developer.
4. The radius dimensions for right-of-way for Hunterwood Court paving detail is shown
incorrectly.
5. As per a discussion approximately 2 months ago, you stated that you would provide
information regarding possible floodplain on Lots 18 & 19, Block 1.
6. Temporary easements may be needed to grade to drain at all storm sewer outfalls. Also,
provide permanent erosion control at all outfall structures.
7. Please provide 45 degree bends in water line as indicated on water line layout (Sheet 7).
There are various other minor comments throughout the plans. Once these comments have been
addressed, the revised set of plans should be resubmitted to the City for review. If you should have
any questions concerning these comments, please contact me at 304-3681.
Sincerely,
Michael A. Martin, E.I.T.
Graduate Engineer