121 BP Phase 1-CS000515 Coppell. Texas '75019
~ PO. BOX478
COPPELL. TEXAS 75019
May 15, 2000
Pat Acker, P.E.
Halff Associates, Inc.
8616 Northwest Plaza Drive
Dallas, TX 75225
RE: One Twenty One Business Park - Addendum for 3rd Irrigation Meter
Fee Assessment Letter
Dear Mr. Acker:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with
a copy of the Development Fee calculations for the referenced development. This
assessment is an addendum to account for a third irrigation meter.
Please make payment to the City of Coppell in the amount of $3,872.05 and forward to
the Finance Department along with a copy of the Fee Assessment table.
Providing a copy of your paid receipt to the Engineering Department will help us to
verify the payment of required fees.
Sincerely,
Kent M. Collins, P.E.
Civil Engineer
cc: Jennifer Armstrong, Finance Director
Debbie Ingrain, Secretary
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
DEVELOPMENT FEE TABLE
Project: One Twenty One Business Park- Addendum for 3rd Irrigation
Date: 05/15/2000
TOTAL
FEES DUE
Water Impact Fee $3,600.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $50.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $192.05
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $0.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $0.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Park Fee $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $0.00
(100% due prior to Council Approval)
Street Light Fee Info not Avail
(100% due prior to Acceptance of Project
Street Sign Fee Info not Avail
(100% due prior to Acceptance of Project
Construction Inspection Fee Info not Avail
TOTAL $3,872.05
DEVELOPMENT FEE WORKSHEET
PROJECT: One Twenty One Business Park - Addendum for 3rd Irrigation Meter
DATE: 05/15/2000
Water Impact Fee:
Domestic Meter(s): 0 = 0 ESU's
Irrigation Meter(s): 1 - 2 inch = 8 ESU's
0 = 0 ESU's
Fireline Meter(s): 0 = 0 ESU's
Total #: 8 ESU's @ $450.00 ea. $3,600.00
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea. $50.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 0 Domestic Meter(s) @ $0.00 $0.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $192.05 $192.05
Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00
Total #: 0 Fireline Meter(s) @ $0.00 $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 0 Meter(s) @ $35.00 ea. $0.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea. $30.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 0 @ $450.00 ea. $0.00
Wastewater Tap Inspection Fee:
Total #: 0 Connections @ $50.00 ea. $0.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 0 Lots @ $50.00 ea. $0.00
(100% due prior to issuance of building permit)
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only): * Preliminary plat approved:
0 Single-family @ $0.00 per lot $0.00
0 Multi-family @ $0.00 per unit $0.00
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations) $0.00
Street Lighting Fees:
Assessed for lighting in the City's right-of-way. Information not Available
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way. Information not Available
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment. Information not Available
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2