Loading...
Park Meadow-LR 860225#lseco Land Development, Inc- 12770 Coit Road Suite 1215 Dallas, Texas 75251 Attn: Mr. Tom Wise Re-' Lime Stabilization Park Neadowa, Phase II Coppe11, Texas 8q-12q1 Dear Hr. M/se: In accordance with your request, on February 17, 1986, we procured six (6) surface soil samples From the Finish subgrade la the streets of the above referenced project. Atterberg Limits teats were performed on each of the samples selected. The results are enclosed. The City of Coppell specifications require lime stabilization on soils which exceed a Plasticity Index of twelve (12). As can be seen From test results, all of the P.I.'s exceeded twelve (12). Therefore, we selected the soils with the higher P.I.'s and added three (3) percent hydrated lime for re-testing. The subsequent tests indicated that three (3) percent lime will reduce the plasticity below the minimum P.I. value. In conclusion, we recommend that three (3) percent hydrated lime, by dry weight, be added to the Finish subgrade of all streets in the project in order to satisfy City of Coppell standards. I trust thls ls the Information you deslre, and 1F we can be of further service, please call on us. Respectfully submitted, D-FW ENGINEERING & TESTING, INC. Louis L. Hargts, P.E. President LLH/ge cc/encl. Soils & MMerials Enlineers -- Construction MM~rlals Testinj & Inspection RESULTS OF.PLAS?ZCIT! INDEX SUB-GRADE ANALYSIS PLASTICITY LOCATION DATE SAI~LED INDEX Park Lane 2~17-86 13 B-1 L-31 Still Forest 2-17-86 B-6 L-1 B-4 L-39 2-17-86 22 B-4 L-50 Still Forest 2-17-86 22 B-q L-3q Still Forest 2-17-86 19 B-4 L-15 Moore Road 2-17-86 18 B-6 L-20 PROJECT: Park Neadows, Phase II 84-12/11 CLIENT: M/seco Land Development, Inc. LIME SERIES CURVE PROJECT: Park Headov$, Fhase ~ DATE: 2-2tl-86 CLIENT: ~[eeco ~and Developaen[~ Inc. JOB NO.: 811-12111 35 25 x =' 15 10 0 0 2 4 6 8 10 PERCENT LIME