121 BP Phase 1-CS 990512TIG The p May 12. 1999 Mr. Ken Griffin. PE CiD' Engineer City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 RE: Impact Fees - 121 Business Park Dear Mr. Griffin: As you are aware. The Industrial Group is ready to begin construction on the 163,000 square foot Phase 1 portion of our planned office park in Coppell. It is our understanding that roadway impact tees will need to be paid in order to obtain building permits. In that regard we are requesting that you calculate these fees for us based on the plans for the park. We will need an invoice form the City in order to draw these fees with our investor. We are currently finalizing our Economic Development Incentive Agreement with the CiD: attorney. As you and I discussed in our meeting with Pat Acker, this agreement calls for the credit of SI75.000 towards the payment of these impact fees in exchange for constructing Northwestern Boulevard on our site and the required public infrastructure improvements thereto. Please credit the total roadway impact tees calculated by this amount. Should you have any questions, please contact me at >.'our earliest convenience. We anticipate starting construction immediately following the completion of this last administrative item. Sincerely Charles A. "Mac" McClure President TIG Financial Services. Inc. CC: A. Donald Chase, Jr. Gary, Kessler Mike Martin P. O. Box 802047 · Dallas, Texas · 75380-2047 · (972) 661-0232 FAX (972) 661-0235 .ROAD AND UTILITY CC .~TRUCTION Proposed Road through 121 Business Park, Coppell Preliminary Engineer's Statement of Probable Construction Cost Number Item Quantity Unit S/Unit Cost Street 1 33' wide, 3000 PSI RC Pavement 1450 SY $25 $36,250 2 6" cement-treated subgrade 1450 SY S2 $2.900 3 3000 PSI RC Curb 800 LF $2 $1,600 4 Earthwork and Compaction 1000 CY $3 $3,000 5 21" RCP (Stub-outs) 60 LF $28 $1.680 6 24" RCP (Stub-outs) 30 LF $34 $1,020 7 27" RCP 120 LF $41 S4.920 8 30" RCP 80 LF $55 S4,400 9 36" RCP 35 LF $70 $2,450 10 42" RCP 100 LF $100 $10,000 11 48" RCP 50 LF $121 $6,050 12 10' Curb Inlet with 21" RCP 4 EA $3,000 $12,000 13 Road Cut and connection 1 LS $2,000 $2,000 14 Remove Existing Curb Inlet 1 LS $1,000 S1,000 15 15% Contingency $13,391 Street Subtotal $102,661 Engineering Design @ 7% $7,186 City Inspection Fees @ 4% $4,106 Street Total S113,953 Water 16 12" PVC Water Line (in proposed road) 400 LF $50 $20,000 17 12" PVC Water Line (B.O.T.O.C.) 50 LF $150 S7,500 18 12" PVC Water Line (along south P.L.) 600 LF $50 $30,000 19 Fire Hydrants (including valves and leads) 2 EA $2.000 $4,000 20 12" Gate Valves 2 EA $1.000 $2,000 21 Water connections I LS $3.000 $3,000 22 15% Contingency $9,975 Water Subtotal $76,475 Engineering Design @ 7% $5,353 City Inspection Fees @ 4% $3,059 Wastewater Water Total S84.887 23 8" PVC Wastewater Line 400 LF $53 S21.200 24 Manholes 2 EA $2.500 $5,000 25 15% Contingency $3,930 Wastewater Subtotal $30,130 Engineering Design @ 7% $2,109 City Inspection Fees @ 4% $1,205 Wastewater Total $33,444 ITOTAL $232,000I Page 1 of 2 Note: This estimate was prepared utilizing standard cost and/or quantity estimating practices. It is understood and agreed that this is an estimate only and that the Engineer shall not be liable to the Owner or to a third party for any failure to accurately estimate the cost of the project or any part thereof. This estimate does not include sales tax. Page 2 of 2