Loading...
Park Meadow-CS 861014GINN, INC. October 14, 1986 CONSULTING ENGINEERS Mr. Tom Wise Wiseco Land Development, Inc. 12770 Coif Road, %1215 Dallas, TX 75241 Re: Park Meadows Phase II - Final Acceptance Dear Mr. Wise: A final inspection of the above referenced project has been confirmed by representatives of Ginn, Inc., M.U.D. %1, and the City of Coppell. Paving and utilities have been verified and are in compliance with the City of Coppell standard requirements. Commitments to the landscape-streetscape ordinances need to be addressed within the.phase of home building. The one-year maintenance bonds and as-built drawings have been received from both contractors. Maturity on the bonds will be one year from the date of this letter (10-14-86). On behalf of the City of Coppell, acknowledgement of acceptance and the release of building permits is effective as of this date. Sincerely, Randy F1 e~mi~ CC ~ Ed Powell Steve Oozam Steve Morton/' Dale Jackson Carl Bass Per Birdsall Jeff Hawkins Wayne Ginn · 16135 Preston Ro~d · Suite 106 · Dallas, Texss 75248 · Phone 214/386-6611 Pavtn9 Cont£actor: Austin Paving Co. P.O. Box 1590 Dallas, TX 75221 630-5100 Mr. Weldon Crank Utility Contracto£= American Developers & Contractors, Inc. 2521 East Main Grand Prairie, TX 75050 1-2~4-263-8884 R. C. 'Rick' Ivy