Loading...
Oakbend Addn-CS 900207NDk NATHAN D. MAIER CONSULTING ENGINEERS, INC. February 7, 1990 Mr. Gary~ City o~oppell_ 25~.~lSarkway Blvd. Texas 75019 .//~oppell, Re: Oakbend Addition NDM Job No. 89-05-072 Dear Gary: Per the staff comments from the February 6, 1990, Development Review Committee meeting, we have made the following changes to the preliminary plat and plans: Plat: 1. Included Park and State Road right-of-way in area to be platted. 2. Shown approximate finished pad and finished floor elevation on creek lots. 3. Increased size of drainage easements to 20 feet. 4. Added note reserving temporary construction easement for drainage improvements in park area. Water & Sewer Plan: 1. Relocated 8 inch sewer into alley, 2. Revised fire hydrant locations. _~-----.3. Increased size of .outfall sewer line to 10 inch diameter. 4. Realigned sewer line at Autumnwood at Oakbend. Drainage Plan: 1. Show off-site drainage area. Enclosed are 22 prints and an 8%" X 11" transparency of the plat. me know if you need additional information. Sincerely, NATHAN D. MAIER Mike Daniel, P.E. cc: Ms. Shohre Daneshmand w/Enclosures Please let Three NorthPark/8800 N. Central Expwy./Suite 300/Dallas, Texas 75231/(214) 739-4741