Loading...
Oakbend Addn-CS 900625 (2)GINN, INC. Date: To: From: Re: CONSULTING ENGINEERS PLAT/PLAN REVIEW MEMOIU~NDUM FINAL PLAT: ~ 1. Platting and PD regula~ons should variances requested as shown. June 25, 1990 Steve Goram, Director of Public Works // John C. Karlsruher, P.E. Review Comm~ ~ the~~nd E~gineering' Plans for ~akbend A~~nd Review be revised to include e 20' wide drainage and drainage and access easements required as follows: A.) 20' drainage and access easement between lots 59 and 60, Block A; B.) 20' drainage easement between lots 51 and 52, Block A; C.) Offsite drainage easements as shown. Street center line curve radii below minimum 425' are used in curves 18, 21, 22. Variance required if not changed. Development along Thweatt Road must comply with Streetscape Ordinance Primary Image Zone. Floodplain Development Permit note and blanks needed on final plat. PLATTING AND PD REGULATIONS: 0 Contribution for improvement of 1/2 of Thweatt Road required. PAVING PLANS: Details of 6" reinforced concrete transition; location and size of existing utilities; and provisions for permanent erosion control in the Thweatt Road R.O.W. must be shown on Sheet 2. Curve data for curve beginning at Sta. 25+50.10 on Oakbend Drive is as incorrect shown on Sheet 4/26. Details of 6" reinforced concrete transition; location and size of existing utilities; and provisions for permanent erosion control in the Thweatt Road R.O.W. must be shown on Sheet 5/26. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 Alley widths are incorrectly shown on Sheets 6, 10, 11, 12, 13, 14, and 15. Centerline curve data required on Post Oak Drive on Sheet 7/26. No flume is allowed at the west end of Post Oak Drive on Sheet 7/26. An enclosed storm sewer will be required. Show curb return radii at intersection of alleys and cul-de- sac on Sheet 7/26. e Flume is not allowed at the west end of Beale Lane on Sheet 8/26. "Elbow" curb radius at the interse~:tion of Oakbend Drive and Au~umnwood Drive is too small on Sheet 9/26. 40' minimum radius required. 10. Alley "A-I" must be revised to conform to a normal alley section on sheets 10 and 11/26. Storm water runoff will not be allowed to cross onto the adjacent property. 11. Alley width dimensions display incorrect 1/2 width dimension on all alley plans. DRAINAGE PLANS: Drainage area map has been marked to indicate required changes in drainage systems. Line "A" on Sheet 17/26 shows flow line to flow line connection at pipe size change from 48" to 30". Crown to Crown connection required. The downstream profile must be extended to show relationship of existing ditch and roadway to proposed storm sewer outfall. An offsite channel may be required. Indicate pipe size, location of special headwall detail add erosion con~rol measures a~ headwall toe as marked on Sheet 18/26. e Sheet 19/26 - Flumes are not allowed for drainage of Post Oak Drive and Beale Lane cul-de-sacs. Revise plans to incorporate enclosed systems. Concrete encasement of sanitary sewer line crossing beneath Line "F" at Station 2+17± will be required. Also show rip rap at Line "F" outfall. Sheet 20/26 - Concrete encasement required on sanitary sewer line at Station 3+72± Line "H". Hydraulic calculations for Line "H" 21" at 8.00% must be shown. Also indicate erosion control measures at Line "H" outfall. WATER AND SEWER PLANS: 1. Sheet 21/25 - Water line valves must be located as marked. Sheets 22 and 23/26 - Concrete encasement of sanitary sewer lines is required as shown for all water and storm sewer crossings with less than 9' vertical separation as marked. FEES DUE: ae Water and Sewer Availability Fee @ $440/unit 1/2 due prior to City Council consideration 138 lots x $440/lot = $60,720.00 1/2 = $30,360.90 due now Bo Water Tap Fee @ $100/meter Due prior to issue of building permits 138 lots x $100/lot = $13,800.00 Sewer Connection Fee @ $100/sewer connection 100% due prior to issue of building permits 138 lots x $100/lot = $13,800.00 D. Construction Permit Fee First deposit @ $500 + $20/lot = $500 + $20 x 138 = $3,260.00 due now Second deposit in an amount equal to 1.5% of the estimated construction cost of the items proposed to be dedicated to the city. This is due prior to issuance of a construction permit. Ee Park Fund @ $150/SF home 100% ~ue prior to final plat approval 138 lots x $150/lot = $20,700.00 DUE NOW Fe Street Light Fee @ $292.60 per light for every 200 feet of roadway. This fee is due prior to final acceptance of the subdivision. Review with Coppell Public Works Street Department. Ge Street Sign Fee as required by the accordance with attached guidelines. permits being issued. Review with Street Department. Street Department in Due prior to building Coppell Public Works TOTAL OF FEES DUE AT THIS TIME = $54,320.00 For questions regarding comments made by Public Works or Engineering Department staff contact the following: Water and Sewer - Water Superintendent, Mr. Howard Pafford, at 214-462-8495. Streets - Streets Superintendent, Mr. Per Birdsall, at 214- 462-8495. Parks - Parks Superintendent, Mr. Richard Diano, at 214-462- 8495. 4. Engineering - John C. Karlsruher, P.E., Ginn, Inc. Consulting Engineers at 214-248-4900. Should there be further questions on policy or disputes which may need to be resolved, please contact Mr. Steve Goram, Director of Public Works, at 214-462-8495. cc: Mike Daniel - Nathan D. Maier Consulting Engineers Gary Sieb