Loading...
Oakbend Addn-CS 901107GINN, INC. November 7, 1990 Ms. Shohre Daneshmand, P.E. City of Coppell P.O. Box 478 Coppell, TX 75019 Re: Oakbend Addition Line "C" - Storm Drainage Line CONSULTING EERS Dear Ms. Daneshmand: Pursuant to recent conversations with Mr. Larry Davis and Mr. Derek Earle (Centex) regarding the above referenced subject, we offer the following. In our opinion, we see no reason not to allow Line "C" of the storm drainage part of Oakbend Addition to be built at this time, provided all other aspects of the Oakbend Addition plans have been reviewed and approved. The proposed channel near lot 52, whether left in its natural state or constructed per city standards; or, if a continuous box culvert is required, should have no effect on the Line "C" outfall. We would have no objections, based upon our review of the plans, to allow the construction of Line "C" storm drainage. Whenever a decision is made on the disposition of the channel in the vicinity of lot 52 and Beal Lane cul-de-sac, then modifications of the outfall may have to be made. We would think the owner/engineer are aware of this possibility. Should you require any further information, please contact our office. Sincerely, Gabe Favre GF/dsp cc: Steve Goram Larry Davis Derek Earle, P.E. - Centex Corp. H. Wayne Ginn, P.E. File 90441 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900