Loading...
Oakbend Addn-CS 901107 (2)GINN, INC. CONSULTING ENGINEERS November 7, 1990 Ms. Shohre Daneshmand, P.E. City of Coppell P.O. Box 478 Coppell, TX 75019 Re: State Road/Freeport Parkway Paving and Drainage Plan Dear Ms. Daneshmand: We have reviewed the above referenced plans for general conformance to the city of Coppell ordinances and standards. The following sets forth our comments. 1. Provide engineer's seal/signature on plans. Address construction of west (southbound) lanes of State Road or escrow money as per Subdivision Ordinance. o Construct longer transition at Thweatt Road and south end of State Road. At Station 5+00, provide access to Lacy property along east side of State Road. 5 o Regarding inlet at Station 8+20 - Why not locate in "low" spot of road? Is 10' inlet adequate to accept proposed runoff? Please address. Does 6' inlet at Station 12+05, located in sag, have enough capacity to carry runoff? o ° 10. Please address siqnage, channelization buttons and barricades in vicinity of the transitions to new State Road from the existing pavement. Show 100 year design flood inundation line in vicinity of proposed channel. Please address advantages/disadvantages of proposed channel vs. enclosed underground storm drainage system 'in vicinity of Station 12+50. Provide paving details for State Road pavemen~ 17103 Prcston Road · Suite 100 · LB 118 ·Dallas, Tcxas 75248 ·Phonc 214/248-4900 11. Include Sheet 16/26 of Oakbend Addition indiCating drainage areas and data for reference. 12. On upper end of Line "A" storm drainage lateral, is drainage easement required? 13. On box culvert and pilot channel details, please indicate: concrete reinforcing details, 100 year water surface elevation and box culvert details. · · 14. Do not recommend carrier pipe be placed through box culvert. Is there another way to service lot 52? Please address. 15. Show elevations on proposed channel. 16. Channel slope section should be 6" minimum as per standard details. Other than the above stated items, we have no further objections to the plans as submitted. Should you have any questions or need additional information, please contact our office. Sincerely, Gabe Favre GF/dsp cc: Steve Goram Taryon Bowman Derek Earle, P.E. - Centex Corp. Nathan D. Maier Consulting Engineers H. Wayne Ginn, P.E. File 90441 '' NOV 9 1990