Oakbend Addn-CS 910418April 18, 1991 COPPELL PUBLIC MEMORANDUM TO: FROM: Larry Davis, Construction Inspector ~ Rey Gonzales, Streets Superintendent~/ RE: Thweatt & Coppell Road - Construction Debris from Storm Larry as you know on 4/12/91 this location washed debris and mud onto the street due to heavy rains. At that time the Street Division sent two (2) men to clean up the intersection. The Police Department as well as the Fire Department were on sight to assist with traffic control and clean-up. The following is a breakdown on the cost incurred by the City for this clean up; street Division Brent Adams Steve Daulton Req. Hrs/Rate 2 @ 10.554 2 @ 8.361 Total Hrs. O.T. Hrs/Rate Cost 1.5 @ 15.831 3.5=$44.86 -0- 2= $16.72 SUBTOTAL $61.58 Police Division 1-Officer Req. Hrs/Rate 1.1 @ 12.847 O.T. Hrs/Rate --0-- Total Hrs. Cost 1.1=$14.14 Fire Division 1- Captain 1- Driver/Engineer 1- Fireman 4- Rookies Req. Hrs/Rate 1.5 @ 8.93 1.5 @ 8.55 1.5 @ 7.08 6 @ 6.73 O.T. Hrs/Rate -0- 1.5=$13.40 -0- 1.5=$12.83 -0- 1.5=$10.62 -0- 6 =$40.38 SUBTOTAL $77.23 Equipment 1 - 480 Tractor @ 8.30 per hr. @ 3.5 Hrs= $29.05 1 - 3/4 Ton Truck @ 4.95 per hr. @ 2 Hrs= $ 9.90 SUBTOTAL $38.95 Total out of pocket expense to the City for this incident= $191.90 This situation was discussed with you via phone conversation on 4/13/91 where you advised that the developer was addressing the problem with hay bales. This was done and on 4/17/91 we received another storm system that again created the situation on this intersection. Two members of the Street Division were contacted by the P.D. at 12:30 a.m. on 4/18/91 to come out and clean this area again. This second occurance took two men at the following cost: Street Division Per Birdsall Brent Adams Equipment 1- 480 Tractor 2- 3/4 Trucks O.T.Hrs/Rate 2.75 @ $20.03 1.5 @ 15.83 SUBTOTAL HRLY Rate/Hrs. 8.30 @ 2.75 Hrs. 4.95 @ 4.25 Hrs. SUBTOTAL TOTAL Total Cost $ 55.0s $ 23.75 $ 78.83 Cost $ 22.83 $ 21.04 $ 43.87 $122.70 Given the fact that we are in the season of substantial rainfalls, I would like to respectfully request an after hours contact number for the contractor/developer, in case this occurs again these individuals can be contacted to do the clean-up. If you have any questions please call me. RG/dg cc: Steve Goram, Director of Public Works THWEATT.RG