Loading...
Oakbend Addn-CS 910419April 19, 1991 COPPELL PUBLIC WORKS MEMORANDUM TO: FROM: RE: Larry Davis, Public Works Inspector Rey Gonzales, Streets SuperintendentS_/ Oakbend Partial Walk-thru Punch List 1) 2) Branchwood Trail Lost 1,2,3 - Branchwood Trail and Thweatt Road intersection - Rework ditch, put down erosion control east and west of Branchwood. - Rout and seal at Branchwood - concrete at asphalt - First two drop inlets - do inverts east and west side - Patch curb at alley on northwest corner - Branchwood - Patch curb at west side at 2nd water meter - Branchwood - Seal all saw joints and redwood headers and drop inlets' tie-ins at curbs Beal Ct. & Oakbend - Drop inlet in Beal Ct. - holding water - 36" RCP in Beal Ct. needs to be turned to flow down stream and headwall constructed - Rout and seal all saw cuts in Beal Ct. - Pour 4'x 4' block out in street - re-do - Make sure all redwood header, saw cuts and drop inlet tie-ins are sealed - Clean all streets and alleys - Oakbend behind Lot 43 - drop inlet in alley doesn't appear to be the right size to accommodate water off of homes and/or lots, etc. - ? on drop inlet and RCP size. Please verify and provide appropriate discharge information. RG/sm