Loading...
Oakbend Addn-CS 910522 (2)DATE = TO= FROM= COPPELL P~BLIC WORKS May 22, 1991 Larry Davis, Construction Inspector~ ReyGonzales, Streets Superintendent~ HAY 2 3 J99l By:. Engineering Oak Bend - Punch List Larry, staff has three (3) major concerns related to this development. Erosion control within the subdivision of all undeveloped lots need to be established till all lots are developed. The guardrail on State Road as well as the concrete Rip Rap and hydromulch of the slopes at the box culvert and along the open channel have yet to be addressed. The signs on State Road need to be set up based on the TMUTCD manual. Prior to this division signing off on this project all these concerns need to be addressed. RG/mp OAKBEND.RG