Loading...
Oakbend Addn-CS 910523 (2)DATE: FROM: COPPELL PUBLIC WORKS BY: En~ineering May 23, 1991 Larry Davis, Construction Inspector Howard Pafford, Water Utilities Superintendent Oakbend Addition/Punch list As you are aware, Utilities personnel have performed a final walkthrough on the above referenced subdivision and have found that all deficient punchlist items have been corrected. However, as we have previously discussed there is a problem with the way that some of the water service meter setters were installed. This meter setter has been equipped with a separate inline dual check and in reviewing the detail for acceptance of this device, I had requested that the inline check be connected to the setter with a 3/4" close (all thread) bronze nipple. This would allow the entire length of the device to fit within the meter box. Based on the comments from field personnel, longer bronze nipples were used in some of the installations. I have spoken with Derek Earle of Centex and he stated that he would correct this problem by having the nipples changed out (if necessary) at the time the plumber installs the plumbing for each house being built in the subdivision. Therefore, I have asked Mr. Earle to submit a letter stating that this would take place. If you have any questions regarding this matter, please advise. HLP/mp cc: Steven G. Goram, Director of Public Works OAKPUNCH. HLP