Loading...
Oakbend Addn-CS 910409DATE: TO: FROM: HE: COPPELL PUBLIC WORKS April 9, 1991 Larry Davis, Construction Inspector/~% Rey Gonzales, Street Superintendent~f/ Punchlist - State Road - Seal concrete/asphalt headers, both ends. - Remove - Keep right sign and pole. (Both sides of transition) - Reduced Speed Ahead sign. (Both sides of transition) - Reduced Speed 15mph sign and pole. (Both sides of transition) - Relocate - Reverse curve sign to furthest pole. (Both sides of transition) - Add - Advisory speed plaque to curve sign. (15mph) - Install - Type III object markers at end of guardrail turn down sections. * 2' to bottom of sign* - Replace broken button at south end. - Seal Inlet block outs. - Need traffic protection at culvert. - Remove/clean out inlets. (framing) - Seal driveway. - Water valve-clean and paint red. - Sealant pulled out at centerline. · Power pole needs to be moved back at Thweat intersection. If you have any questions please contact me. RG/mp STATERD. RG