Oakbend Addn-CS 910409DATE:
TO:
FROM:
HE:
COPPELL PUBLIC WORKS
April 9, 1991
Larry Davis, Construction Inspector/~%
Rey Gonzales, Street Superintendent~f/
Punchlist - State Road
- Seal concrete/asphalt headers, both ends.
- Remove - Keep right sign and pole. (Both sides of transition)
- Reduced Speed Ahead sign. (Both sides of transition)
- Reduced Speed 15mph sign and pole. (Both sides of
transition)
- Relocate - Reverse curve sign to furthest pole. (Both sides
of transition)
- Add - Advisory speed plaque to curve sign. (15mph)
- Install - Type III object markers at end of guardrail turn
down sections. * 2' to bottom of sign*
- Replace broken button at south end.
- Seal Inlet block outs.
- Need traffic protection at culvert.
- Remove/clean out inlets. (framing)
- Seal driveway.
- Water valve-clean and paint red.
- Sealant pulled out at centerline.
· Power pole needs to be moved back at Thweat intersection.
If you have any questions please contact me.
RG/mp
STATERD. RG