Loading...
Oakbend Addn-CS 930224DA,~ M. DOWDEY AND ASSOCIATES, _ ~C. CIVIL ENGINEERS 16250 DALLAS PARKWAY SUITE 100 DALLAS, TEXAS 75248 (214) 931-0694 FAX (214) 931-9538 February 24, 1993 Mr. Kenneth M. Griffin City Engineer City of Coppell P.O. Box 478 Coppell, Texas 75019 Re: Oak Bend Estates Proposed Pedestrian Bridge Dear Mr. Griffin: We are submitting a HEC-II study included with the revised pedestrian bridge details from Lissiak Engineers, Inc. Also included is a grading plan showing existing topographic information, HEC II Sections and 100-year flood elevations. The Albert Halff Storm Water Study was used to determine the beginning water surface elevation and the quantity of flow for Stream Cl. The HEC-II run revealed a 100-year water surface elevation of 497.30 at the proposed bridge. The low chord elevation of the ~~ian bridge has been set at 498.60, allowing for 1.30 feet of freeboard. -~J ~' An addition HEC-II study was run showing the bridge in section number 1095. The 100-year water surface elevation does not change with the addition of the pedestrian bridge. If you should have any questions concerning this issue, please feel free to contact me at your convenience. Sincerely, Michael S. Dowdey~