Loading...
Park Place-CS 910625 CITY OF COPPELL ENGINEERING DEPARTMENT TO: Tom Wise, Project Manager, Wiseco FROM: Larry D nstruction Inspector SUBJECT: Park Place Walk Thru DATE: June 25, 1991 E Alley - Random crack at saw joint - approximate mid-alley. - Mud ball hole north curve. - Seal saw joint west of north curve. General - Check all joints for proper sealant level. - Remove and reseal all concrete chips alon§ saw joints. - Patch all mud ball holes. - Remove concrete slag at Suzzane/Woodcrest. - Remove formboard back of curb-Woodcrest curb inlet. - Cut excess seal from flowline of E/W alley (Suzanne). - Grind curb flowline to eliminate puddles at Heartz and Park Valley both sides. - Patch east edge of alley Block B, Lot 2. - Regrade and clean dirt from special inlet at Sandy Lake and Allencrest. Notes - Type III at Park Valley and Do~wood is lightweight. O.K. if subdivision to the east constructs soon. - Utility poles on north side of north alley are very close to edge of pavement. - Block C, Lot 16, tree very close to alley. - Recommend widening the pavement to accommodate tree and poles. xc: Gary L. Sieb, Director of Planning and Community Services M. Shohre Daneshmand, Acting City Engineer Ben dela Cruz, Engineering Technician Dale Gilreath, Glenn Thurman, Inc. PARKPL6