Park Place-CS 910625 CITY OF COPPELL
ENGINEERING DEPARTMENT
TO: Tom Wise, Project Manager, Wiseco
FROM: Larry D nstruction Inspector
SUBJECT: Park Place Walk Thru
DATE: June 25, 1991
E Alley
- Random crack at saw joint - approximate mid-alley.
- Mud ball hole north curve.
- Seal saw joint west of north curve.
General
- Check all joints for proper sealant level.
- Remove and reseal all concrete chips alon§ saw joints.
- Patch all mud ball holes.
- Remove concrete slag at Suzzane/Woodcrest.
- Remove formboard back of curb-Woodcrest curb inlet.
- Cut excess seal from flowline of E/W alley (Suzanne).
- Grind curb flowline to eliminate puddles at Heartz and Park Valley
both sides.
- Patch east edge of alley Block B, Lot 2.
- Regrade and clean dirt from special inlet at Sandy Lake and
Allencrest.
Notes
- Type III at Park Valley and Do~wood is lightweight. O.K. if
subdivision to the east constructs soon.
- Utility poles on north side of north alley are very close to edge of
pavement.
- Block C, Lot 16, tree very close to alley.
- Recommend widening the pavement to accommodate tree and poles.
xc: Gary L. Sieb, Director of Planning and Community Services
M. Shohre Daneshmand, Acting City Engineer
Ben dela Cruz, Engineering Technician
Dale Gilreath, Glenn Thurman, Inc.
PARKPL6