Loading...
Park Place-CS 910614FRO":~/~y ~m"~'3S, Rt~C~£ Supurintenden~ Partial Release-Park Place-Walkthru 1. Re~ood Seals - Bring up to 1/8" * Alleys 2. Re~ood Seals - Remove any concrete caps 3. 5th Saw joint north of radius, east side, reseal - E. Alley 4. 9th Saw joint reseal 5. Alencrest - saw joint in curb - remove concrete chips and seal 5th joint from north M.H. east side 6th joint from alley east side 6. Rout and seal concrete to asphalt transitions 7. Clean out drop inlet west of Woodcrest 8. Chip off slag 1st panel north of pavers - Woodcrest 9. Reseal 1st joint alley transition (S.) - Woodcrest 10. Reseal 3rd joint alley transition (S.J - Woodcrest 11. Reseal all joints to 1/8" in W. alley 12. Clean around and in co~o inlet at alley junction 13. Seal curb - alley transition south side of north transition - Woodcrest 14. Edge of alley chipped (Allen/Wood) west side 1/2 way 15. General - Street and alleys to be clean. Note: 24" Double trunk oak next to Allen/Wood alley zero clearance MICHAEL R. ALLEN A LLE, P ROPERTV CORPORATION 12:'=C CC, O' :~D LB 9C DALAS -;~ x525,-'3:~