Loading...
Oakbend Addn-CS 950417To: From: RE: Mayor and City Council Kenneth M. Griffin, P.E., Assistant City Manager/City Engineer l~l Discussion concerning the acquisition of a portion of Lot 1, Block fi(Oak Bend ~) Estates for Tweatt Road right-of-way ' Date: April 17, 1995 When the Woodlands of Coppell was being platted, it was noted that to provide the proper centerline radius for the future construction of Sandy Lake Road additional right-of-way should be dedicated off of the northwest comer of the Woodlands of Coppell. The additional right-of- way dedication, if continued west, will encroach on Lot 1, Block A of the Oak Bend Estates Subdivision. When this was brought to my attention, I contacted Centex Homes to inquire about the status of the lot. Currently, the lot is undeveloped and Centex has put an internal hold on the sale of the lot until such time as the City responds back as to whether or not we are interested in purchasing the additional right-of-way at this time. When the Oak Bend Subdivision was platted they dedicated the typical 55 feet from center line, but it appears no thought was given to the future construction of the roadway and the proper centerline radius for the horizontal curve. As can be seen on the attached exhibit, the proper centerline radius will cut through Lot 1, Block A Oak Bend Estates. At this time the City has two options: Option One, do nothing. a. This option puts the City in a future position to either build a roadway with a substandard centerline radius, thereby, affecting the ability of traffic to travel on the roadway in an efficient manner, or; b. At some point in the future when Sandy Lake Road is being constructed the City could be placed in a position of having to purchase and condemn a house on that lot. Option Two, the City can purchase a portion of Lot 1, Block A Oak Bend Estates at this time and hold it as right-of-way until such time as the street is developed. Obviously, the down side to this is that the City would have to mow and maintain this area between now and that time. Also, the future status of the existing screening wall will need to be addressed. The attached exhibit shows the problem as it relates to the construction of a future roadway with a proper centerline radius. I will be available to discuss this in greater detail at the executive session and answer any questions that Council may have. I 1 I I I. -IIV~l/ C]O0~HON¥~I8 / !