Loading...
Park Meadow-LR 851119Maxim Engineers Inc. 2342 Fabens Geotechnical P,O. Box 59902 Materials Testing Dallas, Texas 75229 Con ......... m~4) ,~A~ -~.r r. General Report m m Report Date To Project Iclentification Method of Test 11/19/85 ~mpleDa~ 11/13/85 (Scheduled) Coppell Municipal Utility District c/o Pierce-Lunsford Associates, Inc. Park Meadow II - Coppell, Texas Standby Time Results Time Maxim Engineers, Inc. scheduled for service: l:O0 p.m. Type of service scheduled: In-Place Density Tests Reason for cancellation: Contractor not prepared for tests. Time left lab: Time arrived at job: Time left job: Time returned lab: Total standbY time: 12:30 p.m. l:O0 p.m. 1:30 p.m. 2:00 p.m. 1 1/2 hours 3155-411026 Technician: R.E.D. TN Distribution: Coppell Municipal Utility District c/° Pierce-Lunsford Associates, Inc. - Jeff Hawkins Coppell Municipal Utility District c/o Pierce-Lunsford Associates, Inc. - Craig Goodpastor Ginn, Inc. - Steve Pennington Wiseco Land Development - Tom Wise American Developers & Contractors - Glen Hemphill Maxim Engineers, Inc. Maxim Engine. ers Inc. Geot6~¢h nical Materials Testing Consultants 2342 Fabens P.O, Box 59902 Dallas, Texas 75229 (214) 247-7575 m m In-Place Density of Soil Report Date 11/19/85 Sample Date Page 1 11/11/85 Coppell Municipal Utility District c/o Pierce-Lunsford Associates, Inc. Project Park Meadow II - Coppell, Texas Material 1. Brown and light brown sandy clay with minimal stones 2. Brown clayey sand with clay balls and gravel Maximum Dry Density Optimum Moisture (Lbs./Cu,Ft.) (Percent) lO1.3 16.2 125.1 10.3 Density Test Methods: ASTM D 2922 and D 3017 Method of Compaction: ASTM D 698 et, 0 z Test Matedal No. No. k, 23 2 % 24 2 25 2 ~ 26 2 Dry Lift Location Den~/ I I.bs./Cu,Ft. Finished Waterline, Moore Rd., 100' ll2.0 grade north of Parkway Blvd. Finished Waterline, Moore Rd., 125' 106.3 grade north of Parkway Blvd. Finished Waterline, Moore Rd., south grade end of Moore Rd., lot 14 120.8 Finished Waterline, Moore Rd., lot 17 106.5 Waterline, Moore Rd., lot 20 106.0 Waterline, Moore Rd., lot 23 97.5 Waterline, Moore Rd., lot 23 87.3 Waterline, Moore Rd., lot 9 102.5 Moisture Content (%) 10.2 13.3 grade' 27 2 1st X~ 28 1 1st ~ 29 1 1st 30 .1 1st 8.0 13.3 18.9 18.5 Percent (%) of I Maximum Dry Density 90.0 96.6 101.0 *Does not meet project specifications for moisture content. **Does not meet project specifications for dry density. Remarks and/or Distribution Maxim Engineers, Inc. Reviewed by: ~ Maxim Engineers Inc, Geote'chnical Materials Testing Consultants 2342 Fabens P.O. Box 59902 Dallas, Texas 75229 (214) 247-7575 m m In-Place Density of Soil Report Date Sample Date Pa ge 2 11/19/85 11/11/85 To Project Park Meadow II -Coppell, Texas Material Coppell Municipal Utility District c/o Pierce-Lunsford Associates, Inc. Maximum Dry Density Optimum Moisture (Lbs./Cu. Ft.) (P~'cent) 1. Brown and light brown sandy clay with minimal stones 2. Brown clayey sand.with clay balls and gravel lO1.3 16.2 125.1 10.3 Density Test Methods: Test Material No. No. r.~ 31 1 ~ 32 i o,,u D ou,7 Location Lift 1st Finished grade ~33 1 Finished grade 34 1 Finished grade 35 1 Finished grade ~ 36 1 Finished grade 'x37 1 x% 38 1 Method of Compaction: Lbs./Cu.R. Moisture Content Percent (%) M (%) I M~imum Dry Density Waterline, Moore Rd., lot 2 Waterline, Still Forest Rd. atlot 12 Waterline, Still Forest Rd. at lot 3 Waterline, Still Forest Rd. at lot 6 Waterline, Still Forest Rd. .at lot 9 Waterline, Still Forest Rd. at lot 12 Finished Waterline, Clear Haven at lot subgrade 4 Finished Waterline, Clear Haven at lot subgrade 9 102.5 103.8 lOl.1 102.5 102.8 17.7 lO1.5 lll.O 16.2 109.5 102.8 ~ lO1.4 105.3 19.2 103.8 103.3 17.1 101.9 95.8 ~ 94.5 *Does not meet 3roject specifications for moisture content. Remarks and/or Distribution Maxim Engineers, Inc. Reviewed by: ~ Maxim Engineers Inc. 2342 Fabens Geote~hnical ~ P.O. Box 59902 Materials Testing Dallas, Texas 75229 Consultants (214) 247-7575 m m In-Place Density of Soil noport Det® 11/19/85 San~e Date Page 3 1 l/11/85 To Coppell. Municipal Utility District c/o Pierce-Lunsford Associates, Inc. Project Park Meadow II - Coppell, Texas Material 1. Brown and light brown sandy clay with minimal stones 2. Brown clayey sand with clay balls and gravel Maximum Dry Density (Lb~./Cu. Ft.) lO1.3 125.1 Optimum Moisture (Percent) 16.2 10.3 Density Test Methods: ASTM D 2922 and D 3017 Method of Compaction: ASTM D 698 Test NO. 39 ~'~ 40 ~" 42 <X~ 43 D~ Mstedal Lift Location D~.~ MoistureContent Percent(%)~ No. I Lbs./Cu. Ft. I (%) 1 M~imum D~ Den~ty 1 Finished Waterline, Clear Haven at 98.3 ~2~1'~ 96.9 subgrade lot 12' 1 Finished Waterline, Clear Haven at 111.0 15.7 109.5 subgrade lot 7 1 Finished Waterline, Parkview Place at 97.5 3.~ 96.2 subgrade lot 6 ~ 95.2 Finished Waterline, Parkview Place at subgrade lot 8 Finished Waterline, Moore Road at lot subgrade 23 96.5 lll.3 15.0 109.8 *Does not meet project specifications for moisture content. ~marks ~m Dis~b~ Technician: J.M. 3155-411026 TN Coppell Municipal Utility District c/o Pierce-Lunsford Associates, Inc. - Jeff Hawkins Coppell Municipal Utility District c/o Pierce-Lunsford Associates, Inc. - Craig Goodpastor Wiseco Land Development - Tom Wise Ginn, Inc. - Steve Pennington~-~ American Developers & Contractorsm~.- Glen Hemphill M~im Engin~rs, Inc. Re~ by: rT~