Loading...
Park Meadow-LR 851105Maxim Engineers Inc. Geotechnical Materials Testing Consultants 2342 Fabens P.O. Box 59902 Dallas, Texas 75229 (214) 247-7575 Concrete Cylinder Test Report Report Date To Project Contractor Concrete Supplier and Plant Location of Placement 11/05/85 Coppell Municipal Sample Date 10/04/85 sta~ard Area 28.27 Square inches Utility District c/o Pierce-Lunsford Associates, Inc. Park Meadow II American Developers Pioneer Concrete Star Division, Plant #1604, M~x,o. 4700 Truck #531 Manhole for sanitary sewer on Still Forest Rd., station 3+17, line K M Source/ SSD Batch Wts. Other Data aterials Description (Lbs./Cu./Yd.) Cement Fly Ash Coarse Aggregate Intermediate Aggregate Fine Aggregate Admixtures: 1. 2. Added Water 1"crushed stone none PMII Specimen Number 1 2 3 Curing ASTM C-31 Age (Days) 7 28 28 Test Method Date Tested 10/11/85 11101/85 11/01/85 ASTM C-39 Time Batched: Time Sampled: Ticket No.: Temperature: Weather Conditions: Entrained Air Content Slump In. 2 1/2 Total Load Lbs. Fracture: Regular (UNO) 10:15 a.m. 10:40 a.m, 409144 Ambiem 65° Concrete 79° Cloudy with moderate northerly winds 80400 109700 106000 Compressive Strength P.S.I. 2844 Strength Required P.S.l./days Cylinders Made By: Mo¥o Remarks and/or Distribution TN Coppell Municipal Utility District c/o - Jeff Hawkins Coppell Municipal Utility District c/o - Craig Goodpastor Ginn, Inc. - Steve Pennington ~--: Wiseco Land Development - Tom Wise 3155-411026 Pi erce-Lunsford Associ ares, Inc. Pierce-Lunsford Associates, Inc. Maxim En.q;r, eers, Inc. Rev!cwod by: