Parkview Addition-CS 870915The City With A Beautiful Future PROJECT NAME: PRE-CONSTRUCTION PACKET TIME: P,O. Box 478 Coppell, Texas 75019 214 - 462 - 0022 ATTENDANCE SHEET COMPANY: PHONE: / ( /: ([) CITY OF COPPELL PRE-CONSTRUCTION CONFERENCE PROJECT NAME: TIME: ASSIGNED INSPECTOR: I. ATTENDANCE: (See Attached List) II. PLANS FURNISHED TO: A) CITY B) CONTRACTOR C) OWNER YES /NO YES / NO YES / NO III. UTILITY COMPANIES NOTIFIED: A) TELEPHONE B) OAS C) ELECTRIC D) CABLE T.V. E) OTHER IV. BORING PERMIT STATUS OF RIGHT-OF-WAY AND/OR LAND DOCUMENTS: EASEMENTS YES / HIGHWAY PERMIT YES RAILROAD PERMIT YES STREET CUT PERMIT YES YES NO #,,4. Ve INSPECTION: A. DAILY INSPECTION BY ASSIGNED INSPECTOR Be AFTER HOURS AND WEEKENDS (OVERTIME) TO BE PAID BY THE CONTRACTOR "AT OVERTIME RATES". Ce CONTRACTOR AND SUB-CONTRACTORS TO NOTIFY INSPECTOR AT LEAST TWENTY-FOUR (24) HOURS BEFORE WATER/SANITARY SEWER/STORM SEWER/ PAVING CONSTRUCTION BEGINS. (2) VI. VII. TESTING OF MATERIALS: 2. 3. 4. APPROVED CONCRETE BATCH DESIGN CONCRETE PAVING INCLUDING CORES APPROVED ASPHALT BATCH DESIGN SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR STREET CLOSING REQUIRED: YES IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE AND FIRE DEPARTMENT SEVENTY-TWO (72) HOURS IN ADVANCE. VIII. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL: A. REQUIRED YES B. TRAFFIC DETOUR YES C. WARNING LIGHTS YES . IF STREET DEPARTMENT HAS TO COME OUT TO MOVE THE BARRICADES AND/OR REPLACE ANY BARRICADES, THE CON- TRACTOR WILL BE CHARGED FOR THEIR TIME. NO NO NO IX. AS-BUILT PLANS: CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR SUBMITTING THE CORRECT "AS-BUILT" PLANS TO THE CITY. X. INFORMATION: DEVELOPER: NAME: ADDRESS: PHONE: PROJECT MANAGER: . / I / 2_/'4'-- 3 /- 'g ? 7/ -7 s- 2 (3) GENERAL CONTRACTOR: NAME: ADDRESS: PHONE: SUPERINTENDENT: EXCAVATING CONTRACTOR: NAME: ADDRESS: PHONE: SUPERINTENDENT: PAVING CONTRACTOR: NAME: ADDRESS: PHONE: SUPERINTENDENT: UTILITY CONTRACTOR: GENERAL: NAME: ADDRESS: PHONE: DATE AS-BUILT DRAWINGS - UTILITIES 1 - MYLAR 3 - BLUE LINES AS-BUILT DRAWINGS - PAVING, DRAINAGE 1 - MYLAR 3 - BLUE LINES MAINTENANCE BOND - UTILITIES PRO-RATA WORK SHEET COMPLETED/ STREET ASSESSMENTS WATER AND SEWER FINALED PAVING AND DRAINAGE FINALED DEVELOPMENT INSPECTION FEE: (4) LETTER OF ACCEPTANCE WRITTEN DATE: LETTER OF ACCEPTANCE WILL NOT BE WRITTEN UNTIL THE PUNCH LIST MADE FROM THE WALK-THROUGH HAS BEEN COMPLETED AND RE-INSPECTED BY THE RESPECTIVE DEPARTMENTS. THIS INCLUDES SUBMITTING: AS-BUILTS, BONDS, AND PAYING PRO-RATA. PRE-CONSTRUCTION NOTES ~YEFICIENT PAVEMENT, STRENGTH, THICKNESS. I~REEN WALL. ~UISCUSS ANY CHANGES IN DESIGN - MUST BE IN WRITING FROM DEVELOPER'S ENGINEER TO THE CITY OF COPPELL ENGINEERING DEPARTMENT. L~ONSTRUCTION WATER - NOT AVAILABLE UNTIL PRESSURE TEST AND BACTERIOLOGICAL REPORTS ARE RECEIVED. COR-TEN BOLTS IN FITTINGS. ,~ FIRE HYDRANT BURY LINE AT TOP OF CURB OR HIGHER. STEPS IN MANHOLES. ~0 ~E~E--~VALVES AND HYDRANTS - 4" BURY ON HYDRANTS. ~ ~o~A ~ MUELLER BRASS OR FORD IF MUELLER NOT AVAILABLE. FORD DOUBLE CHECK METER LOOP (SEE CITY SPECIFICATIONS). ~ COLOR CODE HUDRANTS, TOP BONNET AND CAPS. g~~ CITY OF COPPELL~_DENERAL CONSTRUCTION SPECIFICATIONS AVAILABLE AT THE ENGINEERING DEPARTMENT. Z-~ TEMPORARY SANITARY FACILITIES.~ CONSTRUCTION HOURS AND TRAFFIC CONTROL CONSTRICTIONS (HOURS). LANDSCAPE COMMITTMENT.~' LANDSCAPE MAINTENANCE AGREEMENT. ~ PRE.CNSTRCTN. PZAGN (5)