Park West CC(3)-LR000316CONTRA CT INSPECTION SER VICE, Inc.
4305 Glenwood Ct. Granbury, TX 76049 (817) 246-8096 FAX (817) 246-5889
REPORT OF
REINSPECTION OF STRUCTURAL STEEL
Report No: 16851-0
Attention: Keith Atkins
Date of Service: 03-16-00
Project: Daryl Flood Warehouse
Coppell, Texas
Client: Reed Engineering Group
2424 Stutz, Suite 400
Dallas, TX 75235 Page 1 of 1
REPORT OF INSPECTION
Drawings utilized: Structural Prints/SJUAISC
Locations/item inspected:
Grids A - E/8 - 13
Discrepancies/comments:
Reinspection was conducted on the above referenced project in areas noted above with results
as follows:
l) Item #2: From report dated 3-7-00, now completed and complies for:
a) Bearing of joist.
b) Decking puddle welds (size and pattern).
c) Side lap screws.
d) Perimeter angle.
2) Item #5: Anchor bolts from report dated 3-8-00 now complies in area noted above.
Cecil R McKinney, Jr., CWI #99131211
Technician
Contract I~sPection S3rvice
This report is for the exclusive use of our client and shall not be modified or reproduced without written approval from said client