Loading...
Park West CC(3)-LR000229CONTRACT INSPECTION SER VICE, Inc. 4305 Glenwood Ct. Granbury, TX 76049 (817) 246-8096 FAX (817) 246-5889 REPORT OF STRUCTURAL STEEl. ERECTION/DECK INSPECTION Report No: 16654-0 Attention: Keith Atkins Date of Service: 02-29-00 Project: Daryl Flood Warehouse Coppell, Texas Client: Reed Engineering Group 2424 Stutz, Suite 400 Dallas, TX 75235 Page 1 of 1 .... . .......... .......~, ....... ~..~>.~ .... ~.., > ~:,,..,...~.,~.,.,,.....,~...,...~ :::::::::::::::::::::::::::::::::::::::::::::::: ~: !: ~ii!!ii~:i~:!s.i~i:!!.~i~.'..i:~i::!~ii~:~::~:::i~!i~ ~ ~.~ .".'~ ] REPORT OF INSPECTION Drawings utilized: Structural Prints/SJI/AISC Locations/item inspected: Grids D - J/7 - 13 Discrepancies/comments: Inspection was conducted on the above reference project in areas noted above with results as follows: 1.) Perimeter angle - Comply 2.) Joist and girder bear - Comply *3.) Column to girder - Bolts missing in several locations where holes are misaligned. Engineer should advise. 4.) Teflon slide pad comply to detail S4.2-03. 5.) Decking in area E-J/7-13, puddle welds comply af~er corrections were made. *6.) Side lap screws missing in several areas. *Discrepancies Technician .~tract Inspection Service This report is for the exclusive use of our client and shall not be modified or reproduced without written approval from said client