Loading...
Park West CC(3)-LR000121GEOTECHNICAL AND I~ F~I I-"1 I I ENVIRONPIENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Daryl Flood Warehouse Airline Road at Enterprise Road Coppell, Texas REPORTED TO: Daryl Flood Warehouse-Movers, Inc. 2009 Country Club Ddve Carrollton, Texas 75006 ATTN: Mr. Daryl Flood REPORT NO. 44 REG PROJECT NO. 6080 SAMPLE DATE: 01-21-00 TECHNICIAN: P. Olegario CONTRACTOR: McFadden & Miller, Inc. Location of Sample I Set Number I Location I Quantity Represented 1 Panels P-14 and P-12 40/200 2 Panels P-74 and P-63 119/200 Design Information ISource of Concrete I Mix Identification I Specified Strength p.s.i. TXI 46 3000 Test Results Set Cylinder No. ID Date Tested Test lbs. Strength p.s.i, p.s.i. 2O69 2069 2069 2069 01-28-00 7 102300 3620 02-18-00 28 142190 5030 02-18-00 28 142780 5050 Hold 2 2070 2070 2070 2070 01-28-00 7 89710 3170 02-18-00 28 129030 4560 02-18-00 28 119970 4240 Hold 5040 4400 Cylinder Data Set No. 1 2 Cylinder ID 2069 2070 Time of I Slump Sample Air Temp. 5.50 7:25 AM 38 64 6.00 9:10 AM 40 64 Concrete Air Ticket Temp. Entrainment Number N/A 1496479 N/A 1496626 Distribution: (1) Daryl Flood Warehouse-Movers, Inc./ Mr. Daryl Flood (1) McFadden & Miller, Inc./ Mr. Jon Jacobson (1) Meinhardt & Quintana/ Mr. David Meinhardt (1) Halff Associates/Mr. Patrick Acker (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Bihner Engineering/Mr. Yubo Chen Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/rt 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 * TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICALAND G J==l r--~ I I I=~ ENVIRONHENTAL CONSULTANTS REPORTED TO: CONCRETE CYLINDER TEST REPORT Daryl Flood Warehouse Airline Road at Enterprise Road Coppell, Texas Daryl Flood Warehouse-Movers, Inc. 2009 Country Club Drive Carrollton, Texas 75006 ATTN: Mr. Daryl Flood REPORT NO. 30 REG PROJECT NO. 6080 SAMPLE DATE: 01-21-00 TECHNICIAN: P. Olegario CONTRACTOR: McFadden & Miller, Inc. Location of Sample Set Number J Location J Quantity Represented Paving: 80'S, 50'W of SW Bldg. Corner Paving: 40'N, 40'W of SW Bldg. Corner Paving: 30'S, 30'W of SW Bldg. Corner Paving: 50'N, 20'E of SW Bldg. Corner 70~400 150/400 210/400 310/400 Design Information JSource of Concrete J Mix Identification J TXI 9643 Specified Strength p.s.i. 4000 Test Results Set CylinderI I Age@ Total Load No. ID Date Tested Test lbs. 1 2071 01-28-00 7 78340 2770 2071 02-18-00 28 120970 4280 2071 02-18-00 28 120240 4250 2071 Hold Compressive I Average Strength Strength p.s.i.I p.s.i. 2 2072 01-28-00 7 101100 3580 2072 02-18-00 28 138080 4880 2072 02-18-00 28 141180 4990 2072 Hold 3 2073 01-28-00 7 86710 3070 2073 02-18-00 28 133780 4730 2073 02-18-00 28 125940 4450 2073 Hold 4 2074 01-28-00 7 100100 3540 2074 02-18-00 28 137320 4860 2074 02-18-00 28 141320 5000 2074 Hold 427O 4940 459O 493O 2424 STUTZ DR.. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 Cylinder Data Set Cylinder I No. ID Slump Time ofI I Concrete Air Ticket Sample Air Temp. Temp. Entrainment Number 1 2668 2 2669 3 2670 4 2671 5.00 7:45 AM 53 69 5.50 9:30 AM 57 69 5.25 11:00 AM 57 69 5.50 1:00 PM 73 69 5.0 1507952 5.0 1508022 5.0 1508326 5.0 1508562 Distribution: (1) Daryl Flood Warehouse-Movers, Inc./ Mr. Daryl Flood (1) McFadden & Miller, Inc./ Mr. Jon Jacobson (1) Meinhardt & Quintana/ Mr. David Meinhardt (1) Halff Associates/Mr. Patrick Acker (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Bihner Engineering/Mr. Yubo Chen Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KENrt GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Daryl Flood Warehouse Airline Road at Enterprise Road Coppell, Texas REPORTED TO: Daryl Flood Warehouse-Movers, Inc. 2009 Country Club Drive Carrollton, Texas 75006 A'I'TN: Mr. Daryl Flood REPORT NO. 44 REG PROJECT NO. 6080 SAMPLE DATE: 01-21-00 TECHNICIAN: P. Olegario CONTRACTOR: McFadden & Miller, Inc. Location of Sample 1 Panels P-14 and P-12 40/200 2 Panels P-74 and P-63 119/200 Design Information Test Results 1 2069 01-28-00 7 102300 3620 2069 02-16-00 26 2069 02-18-00 28 2069 Hold 2 2070 01-28-00 7 89710 3170 2070 02-18-00 28 2070 02-18-00 28 2070 Hold Cylinder Data 1 2069 5.50 7:25 AM 38 64 N/A 1496479 2 2070 6.00 9:10 AM 40 64 N/A 1496626 Distribution: (1) Daryl Flood Warehouse-Movers, Inc./ Mr. Daryl Flood (1) McFadden & Miller, Inc./ Mr. Jon Jacobson (1) Meinhardt & Quintana/ Mr. David Meinhardt (1) Halff Associates/Mr. Patrick Acker (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Bihner Engineering/Mr. Yubo Chen Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/rt 2424 STUTZ DR. · SUITE 400 * DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICAL AND ~ ~ r'! LJ ~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Daryl Flood Warehouse Airline Road at Enterprise Road Coppell, Texas REPORTED TO: Daryl Flood Warehouse-Movers, Inc. 2009 Country Club Drive Carrollton, Texas 75006 ATTN: Mr. Daryl Flood REPORT NO. 30 REG PROJECT NO. 6080 SAMPLE DATE: 01-21-00 TECHNICIAN: P. Olegario CONTRACTOR: McFadden & Miller, Inc. Location of Sample 1 Paving: 80'S, 50'W of SW Bldg. Corner 70/400 2 Paving: 40'N, 40'W of SW Bldg. Corner 150/400 3 Paving: 30'S, 30'W of SW Bldg. Corner 210/400 4 Paving: 50'N, 20'E of SW Bldg. Corner 310/400 Design Information I TXl 9643 4000 I Test Results 1 2071 01-28-00 7 78340 2770 2071 02-18-00 28 2071 02-18-00 28 2071 Hold 2 2072 01-28-00 7 101100 3580 2072 02-18-00 28 2072 02-18-00 28 2072 Hold 3 2073 01-28-00 7 86710 3070 2073 02-18-00 28 2073 02-18-00 28 2073 Hold 4 2074 01-28-00 7 100100 3540 2074 02-18-00 28 2074 02-18-00 28 2074 Hold 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 Cylinder Data 1 2071 8.00 8:05 AM 38 64 5.1 1496549 2 2072 5.50 9:50 AM 42 65 4.6 1496732 3 2073 6.00 10:55 AM 44 64 4.7 1496956 4 2074 4.50 1:50 PM 50 63 5.0 1497269 Distribution: (1) Daryl Flood Warehouse-Movers, Inc./ Mr. Daryl Flood (1) McFadden & Miller, Inc./ Mr. Jon Jacobson (1) Meinhardt & Quintana/ Mr. David Meinhardt (1) Halff Associates/Mr. Patrick Acker (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Bihner Engineering/Mr. Yubo Chen Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/rt