Loading...
Park West CC(3)-LR000112 (2)GEOTECHNICAL AND G J:==J r-i i i F=:I ENVIRONMENTAL CONSULTANTS REPORTED TO: CONCRETE CYLINDER TEST REPORT Daryl Flood Warehouse Airline Road at Enterprise Road Coppell, Texas Daryl Flood Warehouse-Movers, Inc. 2009 Country Club Drive Carrollton, Texas 75006 A-I-TN: Mr. Daryl Flood REPORT NO. 40 REG PROJECT NO. 6080 SAMPLE DATE: 01-12-00 TECHNICIAN: D. Williams CONTRACTOR: McFadden & Miller, Inc. Location of Sample 1 Floor Slab: 15'N, 10'E from the SW Bldg. corner 10/260 2 Floor Slab: 20'N, 200'E from the SW Bldg. corner 110/260 3 Floor Slab: 20'N, 380'E from the SW Bldg. corner 220/260 Design Information " TXl 47 4000 Test Results 1 1707 01-19-00 7 119080 4210 1707 02-09-00 28 159200 5630 1707 02-09-00 28 155450 5500 5570 1707 Hold H 1708 01-19-00 7 94350 3340 1708 02-09-00 28 146170 5170 1708 02-09-00 28 143170 5060 1708 Hold H 5120 1709 01-19-00 7 110780 3920 1709 02-09-00 28 155880 5510 1709 02-09-00 28 143520 5080 1709 Hold H 53OO Cylinder Data 1 1707 4.75 7:15AM 65 68 NA 1489341 I 2 1708 4.00 8:20AM 66 68 NA 1489492 [ 3 1709 5.00 10:05AM 70 71 NA 1489684 Distribution: (1) Daryl Flood Warehouse-Movers, Inc./ Mr. Daryl Flood (1) McFadden & Miller, Inc./ Mr. Jon Jacobson (1) Meinhardt & Quintana/ Mr. David Meinhardt (1) Halff Associates/Mr. Patrick Acker (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Bihner Engineering/Mr. Yubo Chen Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/rt 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICAL AND G R r-i U P ENVIP, ONMENTAL CONSULTANTS REPORTED TO: CONCRETE CYLINDER TEST REPORT Daryl Flood Warehouse Airline Road at Enterprise Road Coppell, Texas Daryl Flood Warehouse-Movers, Inc. 2009 Country Club Drive Carrollton, Texas 75006 ATTN: Mr. Daryl Flood REPORT NO. 40 REG PROJECT NO. 6080 SAMPLE DATE: 01-12-00 TECHNICIAN: D. Williams CONTRACTOR: Mcfadden & Miller, Inc. Location of Sample ~:~ ~I 1 Floor Slab: 15'N, 10'E from the SW Bldg. corner 10/260 2 Floor Slab: 20'N, 200'E from the SW Bldg. corner 110/260 3 Floor Slab: 20'N, 380 E from the SW Bldg. corner 220/260 Design Information TXI 47 4000 Test Results i'~' 1 1707 01-19-00 7 119080 4210 / 1707 02-09-00 28 ! 1707 02-09-00 28 / 1707 Hold H 1708 01-19-00 7 1708 02-09-00 28 1708 02-09-00 28 1708 Hold H 1709 01-19-00 7 1709 02-09-00 28 1709 02-09-00 28 1709 Hold H 94350 3340 110780 3920 Cylinder Data · 1 1707 4.75 7:15AM 65 68 NA 1489341 2 1708 4,00 8:20AM 66 68 NA 1489492 I 3 1709 5.00 10:05AM 70 71 NA 1489684 Distribution: (1) Daryl Flood Warehouse-Movers, Inc./ Mr. Daryl Flood (1) Mcfadden & Miller, Inc./ Mr. Jon Jacobson (1) Meinhardt & Quintana/ Mr. David Meinhardt (1) Halff Associates/Mr. Patrick Acker (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Bihner Engineering/Mr. Yubo Chen Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KENrt 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 ° TEL [214] 350 5600 ° FAX [214[ 350 0019