Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Park West CC(3)-LR000111
GEOTECHNICALAND G ~ D I I ~ ENVIRONMI:NTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION Daryl Flood Warehouse Airline Road at Enterprise Road Coppell, Texas REPORTED TO: Daryl Flood Warehouse-Movers, Inc. 2009 Country Club Drive Carrollton, Texas 75006 ATTN: Mr. Daryl Flood REPORT NO. 16 REPORT DATE: 01-11-00 REG PROJECT NO. 6080 TECHNICIAN: D. French PAGE: 1 of 1 On this date a representative of Reed Engineering Group, inc. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. 8 5 100-200 12-18 3 4 11.5 5 39,000 140 Surfactant added at regular intervals: Yes Distribution: (1) Daryl Flood Warehouse-Movers, Inc./ Mr. Daryl Flood (1) McFadden & Miller, Inc./ Mr. Jon Jacobson (1) Meinhardt & Quintana/ Mr. David Meinhardt (1) Halff Associates/Mr. Patrick Acker (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Bihner Engineering/Mr. Yubo Chert Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James f. Phipps, P.E. AE/mm 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICAL AND ENVIRONP1ENTAL CONSULTANTS REPORT OF PIER OBSERVATION Daryl Flood Warehouse Airline Road at Enterprise Road Coppell, Texas REPORTED TO: Daryl Flood Warehouse-Movers, Inc. 2009 Country Club Drive Carrollton, Texas 75006 ATTN: Mr. Daryl Flood REPORT NO. 25 REPORT DATE: 01-11-00 REG PROJECT NO. 6080 TECHNICIAN: D. Williams PAGE: 1 of 2 CONTRACTOR: McFadden & Miller, Inc. 12-28-99 12-29-99 J-11.7 30 66 10.3 10.3 J-11.4 30 66 10.9 11.0 J-11.1 30 66 10.4 10.4 J-10.6 30 66 10.6 10.6 J-10.2 30 66 10.3 10.3 J-9.7 30 66 10.5 10.9 J-9.3 30 66 10.4 10.5 J-8.8 30 66 10.6 10.7 J-8.3 30 66 11.0 11.0 J-7.9 30 66 10.2 10.5 J-6.6 30 66 11.2 11.3 J-6.1 30 66 10.3 10.5 J-5.6 30 66 10.5 10.6 J-5.2 30 66 10.6 10.6 J-4.8 30 66 10.2 10.3 J-4.3 30 66 10.1 10.3 J-3.8 30 66 10.8 12.0 J-7 30 66 10.2 10.2 J-7.5 30 66 10.0 10.1 C.7-12 30 60 10.4 10.4 C.3-12 30 60 10.0 10.1 C-12 30 60 10.6 10.6 A-12.2 30 60 11.0 11.1 A-12.5 30 60 10.4 10.4 A-13 30 60 10.4 10.4 A.4-13 30 60 10.7 10.8 A-11.6 30 60 10.2 10.2 A-11.3 30 60 10.3 10.5 A.7-13 30 60 10.3 10.3 B-13 30 60 10.1 10.1 242~. STUTZ DP,. · SUITE ~.00 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [2.14] 350 0019 REPORT NO. 25 REPORT DATE: 01-11-00 REG PROJECT NO. 6080 PAG E: 2 of 2 12-29-99 12-30-99 B.5-13 30 60 10.0 10.3 C-13 30 60 10.2 10.2 C-12.5 30 60 10.3 10.4 A.1-11.7 24 48 10.3 10.3 A.2-11.3 24 48 10.8 11.0 A-11.6 12 30 11.7 12.5 A-11.7 30 60 10.4 10.5 A.2-11.1 30 60 10.5 10.5 A.2-10.8 30 60 10.3 10.3 A.2-10.5 30 60 10.2 10.2 A.2-10.2 30 60 10.6 10.7 A.2-10 30 60 10.2 10.2 A.2-9.7 30 60 10.3 11.4 A.2-9.3 30 60 10.5 10.6 A.2-8.9 30 60 10.4 11.0 A.2-8.8 30 60 10.4 10.6 A.2-8.5 30 60 10.5 10.7 A.2-8.1 30 60 10.6 10.8 A.2-7.8 30 60 10.5 10.9 A.1-7.6 30 60 10.6 11.0 A.2-7.4 24 48 11.3 11.3 A.1-7 24 48 10.4 10.4 A.2-6.6' 24 48 10.8 10.9 * Pier excavation backfilled due to excessive water. Distribution: (1) Daryl Flood Warehouse-Movers Mr. Daryl Flood (1) McFadden & Miller, Inc./ Mr. Jon Jacobson (1) Meinhardt & Quintana/ Mr. David Meinhardt (1) Halff Associates/Mr. Patrick Acker (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Bihner Engineering/Mr. Yubo Chen Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. JP/je [ GEOTECHNICALAND I ~ J~J I--1 I I F~ EN¥1P~ONHI:NTAL CONSULTANTS REPORT OF PIER OBSERVATION Daryl Flood Warehouse Airline Road at Enterprise Road Coppell, Texas REPORTED TO: Daryl Flood Warehouse-Movers, Inc. 2009 Country Club Drive Carrollton, Texas 75006 ATTN: Mr. Daryl Flood REPORT NO. 31 REPORT DATE: 01-11-00 REG PROJECT NO. 6080 TECHNICIAN: D. Williams PAGE: 1 of 2 CONTRACTOR: McFadden & Miller, Inc. 01-03-00 A.2-6.6 24 48 11.0 11.9 A.2-6.4 30 60 10.6 10.6 C-2 30 66 10.4 10.4 C.3-2 30 60 10.5 10.5 C.7-2 30 60 10.4 10.5 A- 1.8 30 60 10.4 10.4 A-1.4 30 60 10.5 10.5 A.2-6.2 30 60 10.5 10.6 A.2-5.9 30 60 10.4 10.5 A.2-5.5 30 60 10.3 10.3 A.2-5.2 30 60 10.8 10.8 A.2-5 30 60 10.6 10.6 A.2-4.7 30 60 10.7 10.7 A.2-4.3 30 60 10.8 10.9 A.2-4 30 60 10.5 10.6 A.2-3.8 30 60 10.4 10.5 A.2-3.5 30 60 10.7 10.7 A.2~3.2 30 60 10.5 10.5 A-2.2 30 60 10.4 10.7 A. 1-2.2 24 48 11.2 11.2 A-2.4 30 60 10.5 10.9 A. 1-2.5 12 30 10.5 10.6 A.2-2.6 24 48 10.5 10.6 A-2.7 30 60 10.4 11.3 A.2-2.8 30 60 10.6 10.6 01-04-00 A-1 30 60 11.0 11.0 A.3-1 30 60 11.3 11.3 A.8-1 30 60 10.5 10.5 B-1 30 60 10.4 10.5 B.5-1 30 60 10.5 10.5 2424 STUTZ DP,. · SUITE 400 · DALLAS. TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 REPORT NO. 31 REPORT DATE: 01-11-00 REG PROJECT NO. 6080 PAGE: 2 of 2 01-04-00 C-1.3 30 66 10.3 10.4 C-1 30 60 10.6 10.7 D-2 30 60 10.4 10.4 D.3-2 30 60 10.5 10.5 D.7-2 30 60 11.2 11.2 E-1.6 30 60 10.4 10.5 E-1.2 30 60 10.6 10.6 E-1 30 60 10.5 10.5 E-0.8 30 60 11.0 11.1 E-0.6 30 60 10.8 10.8 E-0.4 30 60 10.3 10.4 A.3-7 12 30 11.0 11.2 E-12.4 24 48 10.5 10.5 E-12.5 24 48 10.3 10.7 E-12.9 24 48 10.9 10.9 E-13.2 24 48 10.7 10.7 E-13.4 24 48 11.5 11.5 E-13.6 24 48 10.3 10.4 Distribution: (1) Daryl Flood Warehouse-Movers Mr. Daryl Flood (1) McFadden & Miller, Inc./ Mr. Jon Jacobson (1) Meinhardt & Quintana/ Mr. David Meinhardt (1) Halff Associates/Mr. Patrick Acker (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Bihner Engineering/Mr. Yubo Chen Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. JP/je GEOTECHNICALAND I I:~ ~ r-i I I p ENVIRONMENTAL CONSULTANTS REPORT OF PIER OBSERVATION Daryl Flood Warehouse Airline Road at Enterprise Road Coppell, Texas REPORTED TO: daryl Flood Warehouse-Movers, Inc. 2009 Country Club Drive Carrollton, Texas 75006 ATTN: Mr. Daryl Flood REPORT NO. 21 REPORT DATE: 01-11-00 REG PROJECT NO. 6080 TECHNICIAN: D. Williams PAGE: 1 of 2 CONTRACTOR: Mcfadden & Miller, Inc. 12-21-99 B-12 24 48 18.3 18.6 B-11 24 48 10.5 10.8 B-10 24 48 10.0 10.0 B-9 24 48 10.5 10.8 B-8 24 48 11.0 11.1 B-6 24 48 10.9 10.9 B-5 24 48 10.6 10.8 B-4 24 48 13.0 13.1 B-3 24 48 10.6 10.6 B-2 24 48 10.7 10.8 C-3 24 48 10.5 10.5 C-4 24 48 10.4 10.5 C-5 24 48 10.1 10.1 C-6 24 48 10.3 10.4 C-8 24 48 10.5 10.7 C-9 24 48 10.1 10.1 C-10 24 48 10.2 10.3 C-11 24 48 10.5 10.5 B-7 30 60 10.5 10.9 B.5-7 30 60 10.5 12.5 C-7 30 60 10.7 11.5 12-22-99 D-11 24 48 11.8 11.8 D-10 24 48 11.6 11.6 D-9 24 48 10.3 10.3 D-8 24 48 11.0 11.1 D-7 24 48 10.6 10.7 D-6 24 48 10.5 10.5 D-5 24 48 10.1 10.2 D-4 24 48 10.4 10.6 D-3 24 48 10.6 10.6 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 REPORT NO. 21 REPORT DATE: 01-11-00 REG PROJECT NO. 6080 PAGE: 2 of 2 12-22-99 12-27-99 E-3 24 48 10.9 10.9 E-4 24 48 10.2 10.3 E-7 24 48 10.8 11.1 E-10 24 48 10.7 10.8 E-11 24 48 10.5 11.0 E-9 30 60 11.0 11.0 E-8.5 30 60 10.6 10.6 E-8 30 60 10.6 10.6 E-6 30 60 10.3 10.5 E-5.5 30 60 10.6 10.7 E-5 30 60 10.7 10.9 D-12 30 60 10.2 10.2 D.3-12 30 60 10.3 10.3 D.7-12 30 60 10.3 10.3 E-12 30 60 10.0 10.1 E.3-12 30 60 10.2 10.3 F-12 30 60 10.2 10.2 F.3-12 30 60 10.1 10.1 F.7-12 30 60 10.0 10.0 G-12 30 60 10.0 10.0 G.3-12 30 60 10.0 10.0 G.7-12 30 60 9.9 9.9 H-12 30 60 9.8 9.8 H.3-12 30 60 10.1 10.1 H.7-12 30 60 10.0 10.4 J-12 30 60 10.0 10.4 Distribution: (1) Daryl Flood Warehouse-Movers Mr. Daryl Flood (1) McFadden & Miller, Inc./ Mr. Jon Jacobson (1) Meinhardt & Quintana/ Mr. David Meinhardt (1) Halff Associates/Mr. Patrick Acker (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Bihner Engineering/Mr. Yubo Chen Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. JP/mm