Loading...
Park West CC(3)-LR000107GEOTECHNICALAND G F=~ r"l U P ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Daryl Flood Warehouse Airline Road at Enterprise Road Coppell, Texas REPORTED TO: CONTRACTOR: Daryl Flood Warehouse-Movers, Inc. 2009 Country Club Drive Carrollton, Texas 75006 ATTN: Mr. Daryl Flood McFadden & Miller, Inc. REPORT NO. 39 REG PROJECT NO. 6080 SAMPLE DATE: 01-07-00 TECHNICIAN: $. Holiday Location of Sample 1 Slab: 53'N, 5'E of SW Bldg. Corner 10/275 2 Slab: 62'N, 107'E of SW Bldg. Corner 110/275 3 Slab: 60'N, 82'W of SE Bldg. Corner 200/275 Design Information [ TXI 47 4000 Test Results :, ~. . ........... ::~i ::: ~.~; ~ :-:: Il:: 1 1602 01-14-00 7 140720 4980 1602 02-04-00 28 181340 6410 1602 02-04-00 28 185960 6580 6500 1602 Hold 2 1603 01-14-00 7 140290 4960 1603 02-04-00 28 173990 6150 1603 02-04-00 28 186360 6590 1603 Hold 6370 3 1604 01-14-00 7 114230 4040 1604 02-04-00 28 162760 5760 1604 02-04-00 28 158530 5610 1604 Hold 5690 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 Cylinder Data .......... ~!~..~I ..................... i~ ............. l..,~,,~i~ .1......~ l~..~i~.~! I ~iiii~i~l~i~i~l~'~;iiii~~ 1 1602 4,50 7:15 AM 52 67 N/A 1487143 2 1603 3,00 8:45 AM 54 68 N/A 1487280 3 1604 4.50 10:10 AM 54 68 N/A 1487426 Distribution: (1) Daryl Flood Warehouse-Movers, Inc./ Mr. Daryl Flood (1) McFadden & Miller, Inc./ Mr. Jon Jacobson (1) Meinhardt & Quintana/ Mr. David Meinhardt (1) Halff Associates/Mr. Patrick Acker (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Bihner Engineering/Mr. Yubo Chert Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KENrt GEOTECHNICAL AND G F:=I I-1 U F~ ENVIRONMENTAL CONSULTANTS REPORTED TO: CONTRACTOR: CONCRETE CYLINDER TEST REPORT Daryl Flood Warehouse Airline Road at Enterprise Road Coppell, Texas Daryl Flood Warehouse-Movers, Inc. 2009 Country Club Drive Carrollton, Texas 75006 ATTN: Mr. Daryl Flood REPORT NO. 39 REG PROJECT NO. 6080 SAMPLE DATE: 01-07-00 TECHNICIAN: S. Holiday McFadden & Miller, Inc. Location of Sample 1 Slab: 53'N, 5'E of SW Bldg. Corner 10/275 2 Slab: 62'N, 107'E of SW Bldg. Corner 110/275 3 Slab: 60'N, 82'W of SE Bldg. Corner 200~275 Design Information l TXI 47 4000 J Test Results 1 1602 01-14-00 7 140720 4980 1602 02-04-00 28 1602 02-04-00 28 1602 Hold 2 1603 01-14-00 7 140290 4960 1603 02-04-00 28 1603 02-04-00 28 1603 Hold 3 1604 01-14-00 7 114230 1604 02-04-00 28 1604 02-04-00 28 1604 Hold 4040 2424 STUTZ DR o SUITE 400 o DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 Cylinder Data i ........ i ....... 1'602 4.50 7:15 AM 52 67 N/A 1487143 I 2 1603 3.00 8:45 AM 54 68 N/A 1487280 / 3 1604 4.50 10:10 AM 54 68 N/A 1487426 Distribution: (1) Daryl Flood Warehouse-Movers, Inc./ Mr. Daryl Flood (1) McFadden & Miller, Inc./ Mr. Jon Jacobson (1) Meinhardt & Quintana/ Mr. David Meinhardt (1) Halff Associates/Mr. Patrick Acker (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Bihner Engineering/Mr. Yubo Chen Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KENrt GEOTECHNICAL AND ~ F=I I-'1 U F:~ ENVIRONMENTAL CONSULTANTS REPORT OF FIELD DENSITY TESTS Daryl Flood Warehouse Airline Road at Enterprise Road Coppell, Texas REPORTED TO: Daryl Flood Warehouse-Movers, Inc. 2009 Country Club Drive Carrollton, Texas 75006 ATTN: Mr. Daryl Flood REPORT NO. 26 REPORT DATE: 01-07-00 REG PROJECT NO. 6080 TECHNICIAN: R. Bullion PAGE: 1 of 2 CONTRACTOR: McFadden & Miller, Inc. 1 D-698 Brown clay 26.5 89.5 2 D-698 Brown clay (lime-treated) 24.0 93.0 2A D-698 Tan sand 15.5 103.0 115 12-28-99 Water line STA 1+00 3.0 86.4 27.4 1 96.5 116 Water line STA 1 +00 117 Water line STA 1 +00 118 Water line STA 1 +00 119 Water line STA 2+50 120 Water line STA 2+50 121 Water line STA 2+50 122 Water line STA 2+50 123 Water line STA 4+00 124 Water line STA 4+00 125 Water line STA 4+00 126 Water line STA 4+00 127 Water line STA 5+50 128 Water line STA 5+50 129 Water line STA 5+50 130 Water line STA 5+50 131 12-30-99 Storm line STA 1+50 132 Storm line STA 1+50 133 Storm line STA 1+50 134 Storm line STA 3+00 135 Storm line STA 3+00 136 Storm line STA 3+00 2.0 86.2 28.3 1 96.3 1.0 86.8 27.8 1 97.0 0.0 87.3 27.0 1 97.5 3.0 101.1 17.4 2A 98.2 2.0 99.9 18.2 2A 97.0 1.0 86.6 29.2 1 96.8 0.0 86.8 28.4 1 97.0 3.0 99,2 19.0 2A 96.3 2.0 100.6 18.2 2A 97.7 1.0 86.2 28.8 1 96.3 0.0 86.6 27.4 1 96.8 3.0 101.2 17.7 2A 98.3 2.0 100.9 17.5 2A 98.0 1.0 86.4 26.8 1 96.5 0.0 86.9 27.7 1 97.1 2.0 86.5 28.8 1 96.8 1.0 85.9 29.1 1 96.0 0.0 87.4 27.8 1 97.7 2.0 86.6 28.5 1 96.8 1.0 86.8 29.7 1 97.0 0.0 86.2 29.0 1 96.3 2424 5TUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 REPORT NO. 26 REPORT DATE: 01-07-00 REG PROJECT NO. 6080 PAGE: 2 of 2 Comments: Where tested, materials were in compliance with project specifications. Distribution: (1) Daryl Flood Warehouse-Movers, Inc./ Mr. Daryl Flood (1) McFadden & Miller, Inc./ Mr. Jon Jacobson (1) Meinhardt & Quintana/ Mr. David Meinhardt (1) Halff Associates/Mr. Patrick Acker (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Bihner Engineering/Mr. Yubo Chen Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Ronald F. Reed, P.E. KA/je